Rooster CW Transceiver Rev3
Page 5 of 26
22
nd
Nov 2023
Stage 1 :- The DC input socket
The first part of the build is to fit the DC socket.
The socket must be fitted so that its flush to
the board and level with the edge of the PCB,
the position for this is labelled PWR on the
board. It must be square to the edge of the
board as shown here. The silk screen printed
layout can be used to make sure it is positioned
and aligned correctly.
Solder one pin first on the bottom of the board
and checking the part is correctly fitted, once
you’re
happy that it is right solder the remaining
two other pins.
Here is what you should have now.
The 3 legs are now
much too long, they
would short out
when fitted into the
case, use wire
trimmers and cut
the soldered pins
flush to the board.
Do not move on a stage until the current stage you are working on has been completed
correctly. The biggest problem identified with the beta testers was poor soldering and
rushing to get the kit built, do not take short cuts. Each part is as important as the next. Save
your self-problems later by taking care at each stage.
Содержание Bassinet
Страница 22: ...Rooster CW Transceiver Rev3 Page 22 of 26 22nd Nov 2023 Circuit Diagrams...
Страница 23: ...Rooster CW Transceiver Rev3 Page 23 of 26 22nd Nov 2023...
Страница 24: ...Rooster CW Transceiver Rev3 Page 24 of 26 22nd Nov 2023...
Страница 25: ...Rooster CW Transceiver Rev3 Page 25 of 26 22nd Nov 2023 Board Layout...