background image

Katherm QK

Assembly, installation and operating instructions

25

Katherm QK, KaControl version (*C1)

Trench
length [mm]

Nominal
voltage [V
DC]

Mains fre-
quency [Hz]

Nominal
power [W]

Nominal
current [A]

Leakage cur-
rent [mA]

Ri analogue
input [kΩ]

IP class

Protection
class

1000

230

50

7

0.08

-

20

IP00

I

1200

230

50

8.4

0.09

-

20

IP00

I

1400

230

50

9.9

0.10

-

20

IP00

I

1600

230

50

11.3

0.11

-

20

IP00

I

1800

230

50

12.7

0.12

-

20

IP00

I

2000

230

50

12.7

0.12

-

20

IP00

I

2200

230

50

14.1

0.13

-

20

IP00

I

2400

230

50

15.5

0.14

-

20

IP00

I

2600

230

50

17

0.15

-

20

IP00

I

2800

230

50

18.4

0.15

-

20

IP00

I

3000

230

50

19.8

0.16

-

20

IP00

I

3200

230

50

21.2

0.17

-

20

IP00

I

Tab. 7: Maximum electrical rating values Katherm QK

7.2

Electromechanical connection, 24 V (*24)

Note these points in the following wiring diagrams with electromechanical control:

Comply with the details on cable types and cabling with due consideration for VDE 0100.
Without *: NYM-J. The requisite number of wires, including protective earth, is stated on the cable. Cross-sections are
not stated, as the cable length is involved in the calculation of the cross-section.
With *: J-Y(ST)Y 0.8mm. Lay separately from power lines.
If other types of cables are used, they must be at least equivalent.
The terminals on the unit are suitable for a maximum wire cross-section of 2.5 mm².
The Electrical data for PowerKon nano, 230 V need to be respected when rating the in situ mains power supply and fus-
ing.

Содержание Katherm QK 190

Страница 1: ...Katherm QK Assembly installation and operating instructions Keep these instructions in a safe place for future use Issue11 22EN SAP No 1666194...

Страница 2: ......

Страница 3: ...ion 13 5 1 Overview 13 5 2 Brief description 13 6 Installation and wiring 14 6 1 Requirements governing the installation site 14 6 2 Installation 14 6 2 1 Installation steps 14 6 2 2 Screed work 18 6...

Страница 4: ...e 3210002 type 3210006 40 10Maintenance 41 10 1 Securing against reconnection 41 10 2 Maintenance Schedule 41 10 3 Maintenance work 42 10 3 1 Clean the inside of the unit 42 11Faults 43 11 1 Fault tab...

Страница 5: ...apply as do general safety provisions governing the use of the equipment Illustrations in this guide are intended to provide a basic understanding and may differ from the actual model Ongoing tests a...

Страница 6: ...ding s sewage system and power grid The operating limits and limits of use described in Chapter 2 2 6 must be observed Intended use of the unit also includes adherence to these instructions Informatio...

Страница 7: ...refer to VDI 2035 Sheets 1 2 DIN EN 14336 and DIN EN 14868 with regard to the properties of the medium used to protect the equipment The following values provide further guidance The water used shoul...

Страница 8: ...erate the unit in aggressive or corrosive atmospheres e g sea air Never operate the unit above electrical equipment such as switch cabinets computers or other electrical units or contacts that are not...

Страница 9: ...ntion regulations Guidelines and recognised technical regulations i e Association of German Electricians VDE regulations DIN and EN standards VDI 6022 maintenance personnel must be trained to Category...

Страница 10: ...ite IMPORTANT NOTE 2 people are needed to transport the unit Wear personal protective clothing when transporting the unit Only lift the unit on both sides and not by the pipes valves IMPORTANT NOTE Ma...

Страница 11: ...tions and shocks IMPORTANT NOTE Under certain circumstances packages can carry storage instructions that exceed the requirements listed here Comply with these instructions accordingly 3 4 Packaging Ha...

Страница 12: ...41 Sound power level dB A 3 28 49 28 49 Power consumption W 3 6 21 1 3 6 21 1 Current consumption mA 54 173 54 173 Water content l 0 31 1 95 0 42 2 65 Weight kg 11 2 33 6 12 1 37 2 1 at LPHW 75 65 C t...

Страница 13: ...5 Eurokonus valve connection 6 Height adjustment feet with sound insulation 7 Floor trench 8 Coil 9 EC fan 10 Roll up grille example 5 2 Brief description Katherm QK are decentralised units for the he...

Страница 14: ...flow and return water connections on site Connection to the pipe network 20 There is a power supply on site Maximum electrical rating values 24 If need be provide a condensation connection with a suff...

Страница 15: ...Katherm QK Assembly installation and operating instructions 15 6 2 1 Installation steps...

Страница 16: ...Katherm QK Assembly installation and operating instructions 16...

Страница 17: ...Katherm QK Assembly installation and operating instructions 17...

Страница 18: ...tion covers to protect the trenches from dirt are rolled up in the factory The grille can become slightly over long due to the steel springs extending Unrolling the grille and laying it flat for a few...

Страница 19: ...coverings Cover the grille and floor trench with the transparent installation cover to protect the trench from dirt or cement 6 3 Installation Actuator with First Open function When delivered the actu...

Страница 20: ...thout cover panel Window side Window side Room side Room side 1 Flow 2 Return 3 Valve body straight type 346909 pre settable 4 Thermoelectric actuator 24 V type 146906 5 return shut off valve straight...

Страница 21: ...Window side Window side Room side Room side 1 Flow 2 Return 3 Valve body straight type 346909 pre settable 4 Thermoelectric actuator 24 V type 146906 5 return shut off valve straight type 145952 6 Uni...

Страница 22: ...r spigot 2 Connecting brackets 3 Supply air slider 4 Reinforcing struts 5 Perforated plate 6 Filter 7 Example of Optiline roll up grille 8 Kampmann QK shown with Optiline roll up grille 9 Slider Trenc...

Страница 23: ...slider position The height of the supply air module is adjusted using the threaded rods and connected by the installation brackets to the sub strate The slider can be moved into different positions to...

Страница 24: ...IP00 I 2600 230 50 17 0 15 200 IP00 I 2800 230 50 18 4 0 15 200 IP00 I 3000 230 50 19 8 0 16 200 IP00 I 3200 230 50 21 2 0 17 200 IP00 I Tab 5 Maximum electrical rating values Katherm QK Katherm QK 24...

Страница 25: ...230 50 21 2 0 17 20 IP00 I Tab 7 Maximum electrical rating values Katherm QK 7 2 Electromechanical connection 24 V 24 Note these points in the following wiring diagrams with electromechanical control...

Страница 26: ...d control signal for on site fuse 0 63 A and actuator Subject to technical modifications Refer to the control accessory documentation in the event of deviation from the circuit diagrams Trench convect...

Страница 27: ...es W1 Voltage supply and control signal for fan on site fuse 0 63 A and actuator W2 Voltage supply and control signal for fan and actuator W3 Voltage supply fuse by others Central voltage supply 24 V...

Страница 28: ...nductor is stated on the cable Cross sections are not stated as the cable length is involved in the calculation of the cross section With J Y ST Y 0 8mm Lay separately from high voltage lines If other...

Страница 29: ...efer to the control accessory documentation in the event of deviation from the circuit diagrams 3 W1 W2 4 Automationsstation DI Netz 230 VAC Absicherung bauseits Bodenkanal Katherm QK nano 230 V 0 10...

Страница 30: ...er optional Subject to technical modifications Refer to the control accessory documentation in the event of deviation from the circuit diagrams Trench convector Katherm QK 24 V 0 10 V DC Max 10 units...

Страница 31: ...t KaControl unit in line with the wiring diagram The maximum bus length between the KaController and the KaControl master unit is 30 m The respective KaControl automatically becomes the master unit in...

Страница 32: ...low voltage and bus cables Lay all BUS cables in a linear pattern Star shaped wiring is not permitted The KaController is connected via a bus connection to the respect ive control PCB on the unit Rig...

Страница 33: ...other types of cables are used they must be at least equivalent Length of the BUS line from the KaController to unit 1 max 30 m Maximum number of parallel units 6 units CANbus cards type 3260301 neede...

Страница 34: ...of deviation from the circuit diagrams W6 W6 KaController 24 V Type 3210001 or type 3210002 Trench heating Katherm QK nano Unit no 6 230 V KaControl Trench heating Katherm QK nano Unit no 2 230 V KaC...

Страница 35: ...t to technical modifications Refer to the control accessory documentation in the event of deviation from the circuit diagrams Unterflurkonvektor Katherm QK nano Unterflurkonvektor Katherm QK nano Main...

Страница 36: ...eck all external electrical connections and terminal connections are fixed in place and tighten if necessary Check whether DIP switches have been correctly set in accordance with the wiring diagram Wa...

Страница 37: ...e applications surface mounted wall installation on a flush mounted box in visually unobtrusive design operation using 4 sensor keys timer with automatic summer winter switch over option for external...

Страница 38: ...tion 7 MODE button Set operating modes disabled with 2 pipe applications 8 FAN button Set fan control 1 2 Fig 10 KaController type 3210001 KaController without operating keys one button operation type...

Страница 39: ...t room temperature 2 Current time 3 Timer program enabled 4 Weekday 5 Alarm 6 Selected function is locked 7 External ventilation mode is locked 8 Filter alert 9 Eco mode 10 Setpoint setting enabled 11...

Страница 40: ...Time setting Time setting Time setting Adjust the current time by turning and pressing the navigator dial Timer programs Timer programs Timer programs Adjust the switching times by turning and pressin...

Страница 41: ...2 Maintenance Schedule The sections below describe maintenance work needed for the proper and trouble free operation of the equipment If there are signs of increased wear during regular checks shorten...

Страница 42: ...ns 42 10 3 Maintenance work 10 3 1 Clean the inside of the unit Check all elements that come into contact with air internal surfaces of the unit outlet elements etc for dirt or deposits dur ing mainte...

Страница 43: ...t exchanger if you need to Hydraulic connection not properly done Check flow and return and tighten if necessary Unit not heating or cooling sufficiently LPHW CHW Fan is not switched on Switch on fan...

Страница 44: ...ature sensor in the KaController faulty tAL3 Real time clock in the KaController faulty tAL4 EEPROM in the KaController faulty Cn Communication fault with the external control Tab 11 KaController alar...

Страница 45: ...ration of KaController sensor 0 60 60 C t006 LCD display contrast 15 0 15 t007 BEEP setting 0 BEEP ON 1 BEEP OFF 0 0 1 t008 Password for KaController Parameter menu 11 0 999 t009 Minimum settable setp...

Страница 46: ...Katherm QK Assembly installation and operating instructions 46 13 Certificates...

Страница 47: ...Typ Model slo v robku auf das sich diese Erkl rung bezieht mit der den folgenden Norm en oder normativen Dokumenten bereinstimmt to which this declaration relates is in conformity with the following...

Страница 48: ...U Niederspannungsrichtlinie Hendrik Kampmann Lingen Ems den 01 09 2020 ___________________________________ Ort und Datum der Ausstellung Name und Unterschrift des Befugten Place and Date of Issue Name...

Страница 49: ...3 Water quality 7 Tab 4 Technical data Katherm QK supply air module 22 Tab 5 Maximum electrical rating values 24 Tab 6 Maximum electrical rating values 24 Tab 7 Maximum electrical rating values 25 Ta...

Страница 50: ......

Страница 51: ......

Страница 52: ...oducts trench technology katherm qk Country Contact Great Britain Kampmann UK Ltd Dial House Govett Avenue Shepperton Middlesex TW17 8AG T 44 1932 228592 F 44 1932 228949 E info kampmann co uk W Kampm...

Отзывы: