KaCool W
Assembly instructions
6
4.4
Suspending the unit
Use the template (which is part of the packaging) to mark on the suspension points:
1
4
!
≥ 200 mm
≥ 1500 mm
≥
2
0
0
m
m
≥
2
0
0
m
m
3
2
OUT
IN
Drilling template
Dimensions of the suspension points, size 1/ size 2
660
2
6
5
102
1
1
6
6
7
R
3
6
6
Size 1 / size 2 suspension points
Dimensions of the suspension points, size 3/ size 4
965
2
6
5
102
1
1
6
6
7
R
3
6
6
Size 3/ size 4 suspension points
Fix the basic unit to the wall
using screws and rawlplugs
(provided by others).
Once the basic unit has been
installed, make the water-
side and electrical connec-
tions.
Screw the casing to the basic
unit.
Position the casing on the
basic unit so that it sits un-
der the filter rail.
5
Pre-commissioning checks
Before initial commissioning, check whether all the necessary conditions have been met so that
the unit can function safely and properly.
Electrical tests
Check whether all lines have been properly laid.
Check whether all lines have the necessary cross-section.
Are all wires connected in accordance with the electric wiring diagrams?
Is the earth wire connected and wired throughout?
Check all external electrical connections and terminal connections are fixed in place and
tighten if necessary.
Check whether DIP switches have been correctly set in accordance with the wiring diagram.
Water-side checks
Check whether all supply and drainage lines have been properly connected.
Fill pipes and unit with water and bleed.
Check whether all bleed screws are closed.
Check leak tightness (pressure test and visual inspection).
Check whether the parts carrying water have been flushed through.
Check whether any shut-off valves fitted on site are open.
Check whether any electrically actuated shut-off valves have been properly connected.
Check whether all valves and actuators are working properly (note permitted mounting pos-
ition).
Condensation water connection
Check whether the condensation tray is free of building rubble.
Check the condensation drain and operation of the alarm signal on the condensation pump.
Check whether the cooling valve switches off in the event of an alarm signal.
Check whether the unit is connected leak-free to the on-site condensation connection.
Check whether the waste water lines are clean and have a sufficient gradient.
Check whether the condensation pump has a working power supply.
Содержание KaCool W
Страница 20: ...KaCool W 20 2 3 2 4 VDE DIN EN VDI 6022 B C 2 5 3 3 1 Kampmann 2 4 4 1 4 2 200 200 1500 200 4 3...
Страница 22: ...22...
Страница 23: ...23...
Страница 24: ...24...