background image

 

- 6 - 

 

Picture 1.   

1.  Hearth  service  door.  2.  Primary  air  supply  valves.  3.  Internal  cast  iron  door.  4.  Hearth.  

5.  Decorative  thermal  insulation  panels.  6.  Fuel  loading  door.  7.  Body.  8.  Top  loading  cover.  9.  Cooling 
coil installation location *. 10. The pipe of the safety valve (G1). 11. Boiler lifting loop. 12. Service cover.  
13. Ignition damper. 14. The inlet water pipe. 15. Flue with smoke draught damper. 16. Thermometer **. 
17. Air draught regulator. 18. Pressure gauge **. 19. Removable spiral turbulators (16 pcs). 20. Fireclay 
bricks. 21. Combustion chamber. 22. Secondary air supply valve. 23. Secondary air pipe. 24. Return water 
pipe.  25.  Water  drain  pipe.  26.  Grounding  screw.  27.  Clean  hole  cover.  28.  Bottom  thermal  insulation 
panel. 29. Fire grate. 30. Ash drawer. 

* Can be installed if purchased separately. 
**  The  boiler  is  equipped  with  a  thermometer  and  pressure  gauge  (0-120  °C,  0-4  bars)  which  are 

indicative and do not replace the mandatory units for the heating devices. 

 

The boiler body (

7

) (

see picture 1

), welded from special steel sheets, has cavities 

in which water is heated. Boiler exterior is covered with decorative thermal insulation 
shields. Boiler front  has air draught regulator (

17

) controlling  the primary air  supply 

valve  (

2

),  thermometer  (

16

),  pressure  gauge  (

18

)  hearth  service  door  (

1

),  covering 

inner cast iron door (

3

). Fuel loading chamber is closed by the door (

6

). 

Inside the body, ignition damper is installed (

13

), opening the path for the smoke 

to  get  directly  to  the  chimney,  it  is  used  for  boiler  ignition  and  adding  extra  fuel;  as 
well  as  the  fire  grate  (

29

).  Under  the  fire  grate,  ash  collection  drawer  is  installed.  In 

the  combustion  chamber,  fireclay  bricks  (

12

)  are  arranged  as  well  as  secondary  air 

pipe  with  openings  for  the  air  (

16

)  maintaining  high  combustion  temperature  and 

combusting  CO.  For  more  uniform  distribution  of  heat  between  the  heat  exchanger 
walls, removable turbulators (

19

) (16 pcs.) are installed. 

In  the  boiler  sidewalls,  there  are  secondary  air  control  valves  (

22

)  and  ignition 

damper adjustment handle installed. 

In the back of the boiler, there is the water drain (25), return (

24

) and output (

13

water pipes, threaded G2-B, and the flue pipe with the smoke draught damper (

15

). 

On the boiler, separately purchased safety valve (

10

) is installed, having an outer 

one inch (G1) pipe thread. 

In  the  boiler  side  wall,  there  is  a  flanged  connector  (

9

)  used  to  install  the  boiler 

cooling loop. 

It is prohibited to change boiler construction without permission 

Содержание K-2-70

Страница 1: ...CENTRAL HEATING SOLID FUEL BOILER KALVIS 2 70 TECHNICAL CERTIFICATE INSTALLATION AND MAINTENANCE MANUAL Made in Lithuania Pagaminta Lietuvoje LST EN 303 5 2012 20548 87 20548 93...

Страница 2: ...e 12 7 1 System preparation for heating 13 7 2 Boiler start up firing 13 7 3 Air draught regulator adjustment 14 7 4 Boiler firing 14 7 5 Boiler extinguishing 15 7 6 Boiler cleaning 15 7 7 Frequently...

Страница 3: ...a variety of solid lump well dried fuel If desired the boiler is easy to adapt for stoking in mechanized way with pellets The boiler is manufactured using modern materials and technologies We believe...

Страница 4: ...oiler power is too high and it has to be operated at lower than nominal power we recommend to install the boiler with accumulation tank 5 Use fuel no damper than 25 In the case of higher fuel dampness...

Страница 5: ...than 40 Exhausted flue temperature at nominal output up to C 203 Exhausted flue quantity at nominal output kg s 0 058 Connection sockets dimensions flue channel mm 250 heating system in G2 B drainage...

Страница 6: ...er front has air draught regulator 17 controlling the primary air supply valve 2 thermometer 16 pressure gauge 18 hearth service door 1 covering inner cast iron door 3 Fuel loading chamber is closed b...

Страница 7: ...ntry In the extreme case wooden pallet can be used as fuel for the boiler Picture 2 Boiler packing for transportation 6 Boiler installation Boiler is to be installed in the premises meeting the releva...

Страница 8: ...h extra elbow its cross section cannot be less than the cross section of fume escape from boiler hole with bending radius no less than 100 mm tube between the boiler flue and chimney shall be no longe...

Страница 9: ...firemen make the openings in the chimney joint in a suitable place for periodical cleaning of soot once a month it is recommended to have boiler examined by qualified chimney expert once a year Notice...

Страница 10: ...rming which ensures the long service life of the boiler not allows to form the condensate There are not shown the auxiliary technological equipment of the boiler house expansion vessel valves and othe...

Страница 11: ...ary air supply dampers 27 see also chapter 7 3 6 5 Connection of the boiler cooling system According to the requirements of LST EN 303 5 standard par 4 1 5 11 3 for boiler operation it is necessary to...

Страница 12: ...oling system Attention Emergency cooling coil cannot be used for hot water preparation 7 Boiler operate Boiler can be operated by adult persons well familiarized with boiler construction and this tech...

Страница 13: ...ng the boiler from the system are not closed 7 2 Boiler start up firing Before starting the boiler open the smoke draught damper 15 see picture 1 ignition damper 13 through the doors 1 and 3 put crush...

Страница 14: ...and add more fuel in the hearth Tightly close fuel loading door 6 and ignition damper 13 According to the selected temperature with the means of air draught adjuster 17 open the primary air supply va...

Страница 15: ...ically aggressive acids under effect of which boiler service life can be reduced significantly In order to make sure that the boiler is tight stock it at high intensity for several hours then stop sto...

Страница 16: ...oving fuel out of the boilers burning chamber put burning fuel to the utensil with water to get as little fume as possible accessing the premises open windows and doors Do not pour water into burning...

Страница 17: ...is uninstalled due to other reasons Boiler is constructed from various materials so Bring electric appliances if present to electric appliances recycling organization Metal parts go to metal scrap Rem...

Страница 18: ...moisture 35 40 Just cut tree contains 35 60 water Tree cut in the beginning of winter contains least quantity of water Hardwood contains less water Wood has to be cut and split to make firewood Firewo...

Страница 19: ...or free Manufacturer takes no obligation for boiler operation and related consequences grants no warrant if the boiler is inadequately selected poorly installed see chapter 6 or operated see chapter 7...

Страница 20: ...ress Telephone In the case of failure please call Company Address Telephone Manufacturer UAB Kalvis Pramon s 15 LT 78137 iauliai Lietuva Lithuania Telephone 370 671 88891 E mail prekyba kalvis lt Warr...

Страница 21: ...nsions Diameter Height Length Chimney draught Number of elbows Last revision date Outgoing smoke temperature Brief description of boiler connection Fuel used for testing Type During boiler testing fun...

Страница 22: ...ddress Experts Telephone Failure works carried out Repairs date Expert s signature Company Address Expert Telephone Failure works carried out Repairs date Expert s signature Company Address Expert Tel...

Страница 23: ...manual requirements Regarding that I have claims for this product __________________________________________ I think that my upper listed deficiencies are defects of your product so please send your r...

Страница 24: ...24 Stick product barcode here...

Отзывы: