KAKA Industrial F1.2X710 Скачать руководство пользователя страница 4

- 4 -

5. The shaft 16# are put into the upper frame 1 # from the upper hole and then fixed by

guilding bolt 31# and nuts 32# to make the shaft 16# can not be rotary but can

sliding up and down. Inserted adjustable threaded shaft 17 # to the upper frame 1#

from the lower hole and connected with the flat key 19# and handle seat , then fixed

by washer 20# and bolt 21#. The top of 16# is connected with adjustable support

stand13# and locked tensely with bolt 14#.

6. The end of adjustable handle 18# with marking device is inserted into handle

seat .You can turn the handle to adjust the distance between lower wheel 13# and

threaded shaft17#.

7. The hanger 36# is fixed with upper frame through spring washer 34,flat washer 35

and bolt 33.

8. After assembling the whole machine, the work piece will be processed between upper

wheel 5# and lower wheel 13#. According to the needs of processing, you can

choose wheel 37#, 38#, 39#, 40#, 41# instead of 10#.

LUBRICATION

1. All exposed iron surfaces should be coated with light oil to prevent rusting. Use a multi-

purpose or bearing grease for lubrication.

2. The adjusting block should be greased.

3.

Oil the driving shaft through the oil ports monthly.

Отзывы: