ELECTRICAL CONNECTION 

ELECTRICAL WORK TO  BE  CARRIED  OUT  BY 
A QUALIFIED ELECTRICIAN AND TO COMPLY 
TO THE REQUIREMENTS SANS 10142-1

WARNING:  THIS  APPLIANCE  MUST  BE 
EARTHED & BONDED

Before  working  on  the  appliance,  shut  off 
mains power with its external power switch.

Before 

installing 

the 

appliance 

it 

is 

recommended  to  thoroughly  check  the 
electrical  system  to  verify  compliance  with 
established regulations; the manufacturer is not 
liable for damage caused by lack of grounding 
or anomalous power supply.
Check that the mains power supply is rated for 
the  heater’s  maximum  power  draw  (refer  to 
the  nameplate)  and  that  the  electrical  cables 
are  suitably  rated  and  regulatory.  Multi-plugs, 
extensions and adapters may not be used.
Do not use the plumbing, heating or gas pipes 
for  grounding  the  appliance.  If  the  appliance 
has a power cord which requires replacement, 
use  a  cable  of  equivalent  type  (H05VV-F  3x1 
mm

2

, dia 8,5 mm).

WARNING!  For  information  on  how  to  replace 
the power cord, contact an authorised service 
centre or professionally qualified personnel.
The  power  cord  (H05VV-F  3x1  mm

2

,  dia  8,5 

mm) must be routed into the hole (fig.4)  in the 
back  of  the  appliance  and  connected  to  the 
thermostat terminals (fig. 5).

Use  a  two-pole  switch  conforming  with  CEI-
EN  (contact  gap  of  at  least  3  mm,  preferably 
equipped  with  fuses)  to  disconnect  the 
appliance’s  power  supply. The  appliance  must 
be  grounded  with  a  cable  (yellow/green  and 
longer than the phase cable) connected to the 
terminals marked  “ 

 “  (fig.6).

Before  starting  up  the  appliance,  check  that 
the  power  rating  matches  that  given  on  the 
nameplate. If the appliance
has no power cord, it can be installed in one of 
the following ways:
-  connection to mains with a rigid pipe (if the 

appliance has no cable clamp);

-  with  a  flexible  cable  (H05VV-F  3x1mm2,  dia. 

8.5 mm) if the appliance has a cable clamp.

Preparing the system for operation

The collector cover must be left on until the final 
commissioning  stage.  This  avoids  overheating 
and reduces the risk of burns. The system can be 
filled and started for the first time only if a heat 
extractor is present. Check the flange screws are 
tightened when the direct cylinder is installed.

Ensure  that  the  connections  to  the  water  su-
pply is carried out in accordance with EN 806-1 
and in any case in accordance with the applica-
ble local regulations.

Checking for leaks

Perform a pressure test as soon as the collectors 
and pipes have been fitted.
•  Fill  the  system  with  water  using  a  non-

pressurised method (see following section).

•  Raise  the  pressure  to  approx.  1  bar;  make 

sure  that  the  system  and  all  its  connections 
are  watertight  and  that  the  safety  valve  is 
working correctly.

 

Cleaning the system

Before  filling  the  system,  you  must  first  clear 

the  piping  of  all  residue  which  may  have 
accumulated  during  manufacturing  and 
installation.

•  Completely  rinse  the  system  until  all  residue 

has been removed.

• Next, completely empty the system.
 

Fig.6

Содержание THERMO DR-2

Страница 1: ...THERMO DR 2 THERMO DR 2 100 1 N THERMO DR 2 150 1 N THERMO DR 2 200 1 B GB Instruction manual for authorized service personnel...

Страница 2: ...of the appliance and on the potential risks connected with it Children must not play with the appliance Any cleaning and maintenance performed by the user must not be effected by unsupervised childre...

Страница 3: ...om dangerous obstacles and that any impact upon falling is cushioned by semi rigid or deformable surfaces Personal injury caused by falling from a height Make sure that adequate levels of hygiene and...

Страница 4: ...ing position the maximum recommended variation is 30 in relation to the equator Positioning Before installing the solar collector you must choose its position so that the following conditions are sati...

Страница 5: ...t 200 lt 150 lt WARNING The boiler herein can only be used as an integral part of the new solar devices or as a spare part of the same produced by Ariston Thermo Spa the manufacturer does not authoris...

Страница 6: ...to thermal energy heat For this to occur sunlight must be captured by the surface of the absorber The latter consists of a uniform network of tubes through which heat is conveyed The specific shape of...

Страница 7: ...er supply The appliance must be grounded with a cable yellow green and longer than the phase cable connected to the terminals marked fig 6 Before starting up the appliance check that the power rating...

Страница 8: ...Inspect valve mechanism ensure that it is free from any build up and still functioning Confirm valve overflow is not plugged Pressure Control Valve Inspect valve and ensure that the expansion relief v...

Страница 9: ...ipe of diam ter at least equal to the of the outlet itself with a funnel to permit an airgap of at least 20 mm for visual inspection to prevent damage or injury to persons animals and property when th...

Страница 10: ...10 GB...

Страница 11: ...11 GB...

Отзывы: