6.2 Reporting Transport Damage
1. Check the machine for visible and hidden transport damage.
2. Inform the carrier and the manufacturer in writing of any damage without delay.
6.3 Fitting the rubber pads
CAUTION
There is a danger of tilting because of the high centre of gravity and mass of the machine.
➤ Use transport slings to lift the machine.
Fig. 10 Fitting the rubber pads
1
Rubber pad
2
Hexagonal nut
➤ Remove the wooden frame from the base plate.
➤ Fit the rubber pads to the base plate with hexagon nuts.
6.4 Replacing the air filter
➤ Mount the air filter before commissioning.
The inlet opening in the filter must face downwards.
Fig. 11 Replacing the air filter
1
Air filter
➤ Fit the supplied air filter (depending on machine).
Result The machine is ready for operation.
6
Installation
6.2
Reporting Transport Damage
36
Assembly and operating manual 1-stage piston compressor
EPC-G
No.: 9_5752 24 E
Содержание EPC 1500-G
Страница 2: ...KKW PEPC 2 04 en SBA KOLBEN AGGREGAT 1 STUFIG 20170303 120254...
Страница 6: ...Contents iv Assembly and operating manual 1 stage piston compressor EPC G No 9_5752 24 E...
Страница 8: ...List of Illustrations vi Assembly and operating manual 1 stage piston compressor EPC G No 9_5752 24 E...
Страница 10: ...List of Tables viii Assembly and operating manual 1 stage piston compressor EPC G No 9_5752 24 E...
Страница 102: ...13 Annex 13 2 Dimensional Drawing 92 Assembly and operating manual 1 stage piston compressor EPC G No 9_5752 24 E...