Installation possible as shown:
Mounted
Underslung
Hanging from the side
Tab. 21 Installation options
One of the rotors is shaft-driven as specified in the order.
➤ Contact KAESER if the drive should be on the other rotor.
6.4 Installing the blower block
Precondition Ensure that the machine in which the blower block is installed is isolated from the mains and fully
vented.
WARNING
Serious injury or death can result from loosening or opening components under pressure.
➤ De-pressurise all pressurised components and enclosures.
CAUTION
Rotating rotors.
Danger of squashing or severing.
➤ Do not reach into the interior of the block.
Permissible angle deviation in horizontal position
Fig. 4 Permissible angle deviation:
X
± 5 °
Y
± 5 °
1. Before installing the blower block, remove the two transport plugs from the gas drainage ports
on the underside of the block to prevent oil being forced into the conveying chamber. Hold the
gas drains open.
The gear-end and drive-end oil chambers must not be connected.
6
Installation
6.4
Installing the blower block
Number: 9_9533 23 E
Assembly and operating manual Blower block
OMEGA 4 B