KAEL Muhendislik Elektronik VARkombi-12-PC-TFT-OG-SOLAR Скачать руководство пользователя страница 11

2 3

5 6

8 9

11 12

30

Step info.

1
2
3
4
5
6

8
9

10
11
12

16
17
18

13
14
15

7

7

4

1

10

Operation Time

34 

hours

Number of switching

663 

times

-1.000 

KVar

R S

T

Total power

Select

Exit

Current
Voltage

2 3

5 6

8 9

11 12

30

7

4

1

10

14

Exit

Setting

THD = 27.0

THD = 29.0

THD = 29.0

R

S

T

30

10

3

3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

T

1. MENU 

This is the section in which many of the electrical measurements 

are monitored and set-up are made. The parameters are 

accessed by direction keys in the menu, parameters are inserted 

by “Select” key and exit from the parameters by “Exit” key. 

P.S.:

 Set-up section can only be accessed by password.

Harmonics

Displays the harmonic amplitude and % 

values of voltage as well as current of three 

phases up to 31.harmonic in terms of linear or 

logarithmic on colour graphics screen.

Total harmonic 
column(for three phase)

R S T

Allows to switch between 
the harmonics

The section in which;
- current or voltage,
- % or amplitude
- linear or logarithmic 
selections of harmonics are made.

Amplitude or % 
values of 
harmonic 
distortion

Step Monitoring

All steps can be accessed by up and down keys. Step 

information of  the step with red frame (      ) among the step 

boxes is displayed on the left side of the screen while moving 

with directon keys.

The information regarding the runtime of all steps, number of 

switching, phase or phase to which they are connected, total 

power values and whether they are capacitor or reactor can 

all be accessed.

These values can be deleted when you make a change in 

step. “Select” key is pressed for deleting on the related step. 

Selecting the required type of deleting from the sub-screens 

shown on the right side, operation can be realized.

Voltage, Current, Frequency

This is the section in which the current, voltage and frequency 

drawn from the system are monitored.

Power

This is the section in which active, reactive and apparent 

powers drawn from each phase and, total active, reactive and 

apparent powers are monitored.

These values can be observed by selecting “Powers” or 

“Total” at the bottom of the screen.

1 1

1 3

1 4

100
 %f

A

A

A

V

Select

Exit

1 1

MENU

Harmonics

Step Monitoring

Voltage,Current,Frequency

Power
Energy

2 3

5 6

8 9

11 12

7

4

1

10

30

Exit

Amp

-Volt

%

-Ampl.

Log

-Lin

Exit

Delete all

Delete

Cancel

Yes

No

2 3

5 6

8 9

11 12

30

V

7

4

1

10

R

S

T

Exit

219.8

219.2

220.2

A

60.48

71.32

43.29

f

49.9

 Hz

2 3

5 6

8 9

11 12

30

Q

Var

7

4

1

10

R
S
T

Exit

0.864

 KVar

Total

P

W

R
S
T

33.17

 KW

S

VA

R
S
T

33.18

 KVA

Powers

Total

8

1 2

Содержание VARkombi-12-PC-TFT-OG-SOLAR

Страница 1: ...KAEL M hendislik Elektronik Tic ve San Ltd ti Power Factor Controller 12 Step VARkombi 12 PC TFT OG SOLAR Connection type selective VARkombi 12 PC TFT OG SOLAR Solar Plant compensation...

Страница 2: ...7 8 Current Transformer Primary Value 1 7 9 Number of Steps 1 7 10 Advanced Set up Menu 1 7 10 1 T on Transition Delay Time 1 7 10 2 T off Transition Delay Time 1 7 10 3 Current Flow Direction Detecti...

Страница 3: ...ver Temperature 1 7 10 6 2 4 Voltage THD Setting 1 7 10 6 2 5 Voltage HD Setting 1 7 10 6 2 6 Current THD Setting 1 7 10 6 2 7 Current HD Setting 1 7 10 6 3 Fan Settings 1 7 10 6 3 1 Fan Temperature V...

Страница 4: ...use the device for different purposes other than compensation system 6 Fix the device tightly on the control panel with the apparatus given on the device without hanging around 7 Do not interfere to t...

Страница 5: ...esponse time Making compensation for the generator according to the second Cos 2 set up Displaying many guiding screens operating system is used in the micro processor Computer communicated RS485 MODB...

Страница 6: ...r groups It is recomended to connect single phase capacitors to the second and third 6 steps and to connect capacitors or reactors to the third 6 steps in terms of accepting the statements in this man...

Страница 7: ...er the other according to the priority Meanwhile the phase in which the alarm is given displayed on the screen Arrow keys can move between the alarms In case Select key is pressed during on any alarm...

Страница 8: ...e checked again in case any power of the steps and their connections are not intenalized for a long time 5 Step Learning of step powers For more info When all the steps are internalized the main scree...

Страница 9: ...Consumptions Instant consumption values of each phase and their scaled representation the normal under and over compensation of the phases their inductive capacitive characterized loads and whether t...

Страница 10: ...rol Otherwise the device remains in manual control continuously 1 2 3 4 5 6 7 8 9 11 10 12 30 Menu Cos PF Steps 0 R S T 0 ind cap ind cap ind cap S T Q 1 763K P 21 44K PF 0 991 0 155K 14 66K 0 999 1 4...

Страница 11: ...tep with red frame among the step boxes is displayed on the left side of the screen while moving with directon keys The information regarding the runtime of all steps number of switching phase or phas...

Страница 12: ...ave Changes appears on the screen the data are kept in the memory by pressing Okay key Settings This is the section in which you can find all set up regarding the device Password is entered After comm...

Страница 13: ...r DYN 5 NOTE The current transformer ratio must be entered in the section from the menu 1 7 8 select exit 1 7 Measurement types MV LV ratio Transformer Type 2 3 5 6 8 9 11 12 7 4 1 10 30 1 1 Enter MV...

Страница 14: ...1 10 30 Connection MEDIUM VOLTAGE LOW VOLTAGE Voltage become isolated The value of the voltage transformer must be entered NOTE The current transformer ratio must be entered in the section from the m...

Страница 15: ...or the deadline This causes delays in the compensation VARkombi 12 PC TFT OG It collects the energies ind cap active consumed Step activating and de activating periods are decreased or increased autom...

Страница 16: ...lows down by means of dynamic control of switch off time and continously do not make fast moves unnecessarily P S 1 Switch off time counts only for capacitor activated newly If necessary and a close s...

Страница 17: ...ge will appear on the screen When Okay key is pressed the value is taken into memory Enter cap penalty limit 2 3 5 6 8 9 11 12 7 4 1 10 30 Apply 10 Enter cap penalty limit 2 3 5 6 8 9 11 12 7 4 1 10 3...

Страница 18: ...s are entered in the same way by using the up and down keys Press Apply key inorder to take T off switching time into memory Save changes message will appear on the screen When Okay key is pressed the...

Страница 19: ...ation in some plants especially the plants in which the loads are changing very quickly The required status for function is selected by using the up and down keys Press Apply key inorder to take this...

Страница 20: ...2 3 5 6 8 9 11 12 7 4 1 10 14 30 Exit 3 phase Select R S T 1 Step 1 phase 0 000 KVAr 0 000 KVAr 0 000 KVAr 0 000 KVAr 2 3 5 6 8 9 11 12 7 4 1 10 30 3 phase R S T 1 Step 1 phase 0 000 KVAr 0 000 KVAr 0...

Страница 21: ...00 K Step Change 2 3 4 5 6 8 9 10 11 12 16 17 14 15 1 7 13 2 3 5 6 8 9 11 12 7 4 1 10 30 Exit Load New value Old value Old value R S T 0 000 K 0 000 K 0 000 K 0 000 K Step Change 2 3 4 5 6 8 9 10 11 1...

Страница 22: ...under compensation in any phase during the activation of alert device warns the user In this case Review the capacitor power distribution in the steps especially in the phase where the alert is given...

Страница 23: ...s may blowed out The fuses in the power line of capacitors may blowed out Removing the failure steps internalized zero should be internalized again 1 7 10 6 1 General Alarms Over Temperature enable 2...

Страница 24: ...digit All values are entered in the same way by using up and downkeys Select key is pressed to take them into the memory Save changes message will appear on the screen Pressing Okay key the value is...

Страница 25: ...essing Okay key the value is taken into the memory 5 005 Voltage HD Alarm Setting HDV Save Changes In case harmonic protection is activated in the step protection function Chapter 1710643 all steps ar...

Страница 26: ...0 30 Apply disable Fan Output 1 7 10 6 4 Setting Advanced Setting Menu Alarm Protection Step Protection Function De activation of the capacitors is recommended to protect them against temperature volt...

Страница 27: ...30 Apply Enable User Password Status 2 3 5 6 8 9 11 12 7 4 1 10 30 Exit Password active passive Password change 1 7 9 7 2 PASSWORD Enter old password 0 2 3 5 6 8 9 11 12 7 4 1 10 30 Exit Password acti...

Страница 28: ...ssword should be entered to write data This is the section in which the password is entered The value is setup to the required value by using the up and down key starting from the digit where the blue...

Страница 29: ...ing Okay key the value is taken into the memory Device No 001 255 The value is setup to the required value by using the up and down key starting from the digit where the blue line is Then left key is...

Страница 30: ...ting Values THD Current 30 Alarm Setting Values HD Current 30 Fan Settings Fan Temperature Value 50 C Fan Settings Fan Output disable Level Protection Function Temperature Protection disable Level Pro...

Страница 31: ...Device No 1 255 Device Protection Class IP 20 Terminal Protection Class IP 00 Environment Temperature 5 C 50 C Humudity 15 95 without condensation Device Standart EN 55011 EN 61326 EN 61000 3 2 EN 61...

Страница 32: ...A CALCULATION CHART ACCORDING TO CAPACITOR CONNECTION FORMAT Capacitor Powers 3 Phase Connection Phase Neutral Connection Phase Neutral bridged Connection Phase Phase Connection Phase Phase bridged Co...

Отзывы: