Page 11
KACO blueplanet 3.0 NX1 M2 KACO blueplanet 3.7 NX1 M2 KACO blueplanet 4.0 NX1 M2 KACO blueplanet 5.0 NX1 M2
2.5
Dynamic feed-in
Open <Communication Device> menu.
Connection established according to block
diagram Fig. 39
Note
:
Further information can be found in
1. Select menu item <Feed-in control and
Meter Settings>.
2. Select smart meter model >> SDM230
3. Toggle on the <Enable Meter Data
processing> when the meter is connected.
4. Toggle on the <Enable Feed-in Control>
when the meter is connected.
5. Via <Maximum Feed-in Power> set in
watts the maximum power which the
device may feed into the grid.
Note:
This setting is only possible under 2
conditions:
1.
Smart meter model connected to
the device.
2.
<Active power control> is activated
in the <Settings for> menu under
<Functions active/deactivate>.
6. Start function by <confirm>.
5. If conditions are not fulfilled, please
make up for them. See chapter 4.2 on
page 16
»
Dynamic feed-in set.
Fig. 37.
Select feed and meter settings
Fig. 38.
Select smart meter model and
set max. feed-in power
Fig. 39.
Block diagram for dynamic feed-in