background image

har

dw

ar

e k

e

y

A

A

B

C

D

centre line

320mm

335mm

±

5mm

front of base cabinet

C

D

B

centre hole

centre hole

st

ep 2

p.

 

2

Ver. 3

W-50529

1.

brackets

25mm  

wood screw

16mm  

wood screw

bin frame

pre-drilling brackets

measuring up for brackets

1.

2.

2.

4x17L 

base mount pullout bin

On the base of the cabinet mark out a parallel line in the middle 
of the cabinet. Then mark out 160mm from the centre line both 
ways. Lastly, mark out a line 97mm from the front edge of the 
cabinet as pictured above. 

Further secure the bin frame and the brackets to the cabinet 
using 16 X 16mm wood screws (D) as pictured above.

securing frame and brackets

Align the bin frame (A) and the brackets (B) with the pre-drilled 
holes as pictured above and fix through the centre hole to the 
cabinet using 6x25mm wood screws (C). 

D

82mm

 +/-

 1mm

82mm

 +/-

 1mm

335mm

±

5mm

Pre-drill a hole, using a 2mm drill bit to a depth of roughly 
2.5mm, where the lines cross.

C

C

B

Отзывы: