4
4
3
!
Use a standard ratchet or drill with a 13mm deep box socket and drive in the socket head cap screw and
tighten to 12 ft-lbs.
NOTE:
While tightening the K2 Yeti Clamp 2.0 with the socket pull the Paper Strap towards you.
Do not use an impact drill.
!
Position the module flush to the end of the rail. Pull the Paper Strap toward
you so the K2 Yeti Clamp 2.0 slips over the module frame