background image

4

4

3

!

Use a standard ratchet or drill with a 13mm deep box socket and drive in the socket head cap screw and 
tighten to 12 ft-lbs.

NOTE: 

While tightening the K2 Yeti Clamp 2.0 with the socket pull the Paper Strap towards you.

Do not use an impact drill.

!

Position the module flush to the end of the rail. Pull the Paper Strap toward 
you so the K2 Yeti Clamp 2.0 slips over the module frame

Отзывы: