20
!
Push zip tie up into leash channel located on bottom of Yeti Clamp. Slide clamp into rail channel with
bolt facing outward. Leave enough room for the module to be placed. Place the module flush to end
of rail. Pull leash toward you so the clamp slides over module frame. Torque to 12 ft-lbs. Use your
hand to ensure the Yeti Clamp is fully engagaed with the frame of the module as shown in the image.
Note: The Yeti Clamp must be installed in an array. It can-not be installed on a single module that is not
connected to the array by a mid clamp.
!
Lay modules down in a row one at
a time. Safely connect and properly
manage wires before module
installation. We recommend starting at
the bottom module row and working up.
9
8b
Содержание CrossRail Shared Rail System
Страница 24: ...24 Notes ...
Страница 25: ...25 Notes ...