background image

4

3

!

Using an additional piece of 
K2 butyl or a standard comp 
shingle starter course, level 
out the roof surface under the 
Splice Foot.

For a video on mount leveling 
please refer to Splice Foot 
installation video: https://
www.youtube.com/c/
K2SystemsUSMX

Leveling Uneven Roof Surfaces

2b

!

For deck attachments, follow steps in 2a, but only use Splice Foot screws in the four corners of the mount. 
When possible always attach mounts to the rafter and only use deck attached as a secondary option when 
rafters are not within mounting zones for the array. Follow K2 engineered calculations and span charts for deck 
attachments. 
When deck attaching check for positive engagement into plywood and avoid plywood seams.

Mount Placement and Installation (Deck Connection)

Содержание Splice Foot X

Страница 1: ...Patent Pending k2 systems com We support PV systems Formerly Everest Solar Systems Splice Foot X XL QUICK GUIDE ...

Страница 2: ... products though it is solely the responsibility of the installer to choose compatible code compliant products for the roofing and racking systems in use For a list of products and roofing best practice resources visit https k2 systems com en US base camp or call 1 760 301 5300 verify and use main office line for technical support from a K2 Systems representative Important Note The Splice Foot X X...

Страница 3: ...ount spacing 2a Locate the rafter and clean roofing surface for mount placement Peel back protective paper from butyl and stick down mount on a single shingle course with the two center holes lining up over the rafter Position all mounts in the same direction with the long side towards the ridge Drive provided lag screws into the rafter until the conical washer stops rotating providing a positive ...

Страница 4: ...aces 2b For deck attachments follow steps in 2a but only use Splice Foot screws in the four corners of the mount When possible always attach mounts to the rafter and only use deck attached as a secondary option when rafters are not within mounting zones for the array Follow K2 engineered calculations and span charts for deck attachments When deck attaching check for positive engagement into plywoo...

Страница 5: ... comes within 2 of the lag screw fill the seam with roof sealant Sealant application 5a Position and install rail on back side of Splice Foot towards the ridge as shown in the image Insert only one T Bolt through one Splice Foot slot and into side channel of CrossRail Turn the T Bolt clockwise ensuring that the mark at the end of the shaft is vertical indicating proper alignment Tighten to 25 8 ft...

Страница 6: ...el of CrossRail Turn the T Bolts clockwise ensuring that the mark at the end of the shaft is vertical indicating proper alignment Leave a 5 8 gap between rails in the center of the Splice Foot Tighten to 25 8 ft lbs 35 Nm Note Rail connector function for Splice Foot is only compatible with mill rail Splicing two rails ...

Отзывы: