4
3
!
Using an additional piece of
K2 butyl or a standard comp
shingle starter course, level
out the roof surface under the
Splice Foot.
For a video on mount leveling
please refer to Splice Foot
installation video: https://
www.youtube.com/c/
K2SystemsUSMX
Leveling Uneven Roof Surfaces
2b
!
For deck attachments, follow steps in 2a, but only use Splice Foot screws in the four corners of the mount.
When possible always attach mounts to the rafter and only use deck attached as a secondary option when
rafters are not within mounting zones for the array. Follow K2 engineered calculations and span charts for deck
attachments.
When deck attaching check for positive engagement into plywood and avoid plywood seams.
Mount Placement and Installation (Deck Connection)