background image

6. User Flow

1) Make a sketch of the checking places that the guard needs to

check.

2) Install tags on each checking place.

*The round shape tag can be stuck or screwed on the wall.

*For the cylinder glass tag, make a hole in the wall, and then put it

inside and cover it.

3) Install software and make settings in software
4) The guard starts to patrol, he needs go to each checking place and

uses the reader to scan tags installed on the wall.

5) The guard will take the reader back to the control center and use

USB cable to upload data to software.

Содержание GUARD TOUR WM-5000F3

Страница 1: ...GUARD TOUR MANAGEMENT SYSTEM USER S MANUAL WM 5000F3...

Страница 2: ...l accomplish their tasks within the predefined time intervals There is a wide variety of guard tour systems which can be divided in two major categories Wand guard tour systems based on handheld devic...

Страница 3: ...ce supervising personnel work time and place monitoring scheduled technical maintenance supervising guards supervising service producers supervising drivers monitoring rent systems airport protection...

Страница 4: ...me Reading guard tag 1 vibration with screen shows checkpoint s name Reading checkpoint Red solid light the battery logo has a charging prompt The reader is charging 3 vibrations with screen shows tim...

Страница 5: ...Temperature 40 to 85 Storage Capacity 100 000 pieces records Memory 4G Flash ROM Pixel 500 Pixels Screen Size 2 7 Inch IP Rating IP67 Charging Time 5 hours Battery 3 7V Lithium Recharge Battery Stand...

Страница 6: ...System Components 1 WM 5000F3 reader 2 Magnetic cable 3 Software 4 Charger 5 Holster 6 RFID tags optional purchase 7 Guard ID cards optional purchase 8 Event wallet optional purchase 1 7 1 7g 3 8g 2...

Страница 7: ...he wall For the cylinder glass tag make a hole in the wall and then put it inside and cover it 3 Install software and make settings in software 4 The guard starts to patrol he needs go to each checkin...

Страница 8: ...d press OK the name become red and press the read the same checkpoint again press OK the plan name become red and press the read the same checkpoint third times If you didn t setup the event there is...

Страница 9: ...comes red then back Next you can use the device to patrol checkpoints During your patrolling if you want take a photo you can do like this Press the camera for several seconds it will turn on the came...

Страница 10: ...rdware from defects in material and workmanship for a period of 90 days The 90 days warranty period begins the date when repair or remanufactured product is shipped from us 4 This warranty does not ap...

Страница 11: ...JWM Hi Tech Development Co Ltd TEL 0086 24 83782790 Email sales jwm rfid com support jwm rfid com Web http www jwm rfid com...

Отзывы: