2-35
Note :
• For the greasing and oiling locations,
see “SECTION 5 PARTS LIST” (Page 5-6).
2.14
LIST OF PROCEDURES FOR DISASSEMBLY
7
8
12
17
35
30
22
29
34
23
24
20
36
40
27
26
B
28
39
5
31
25
33
9
21
13
11
14
15
16
6
2
38
42
3
19
41
37
32
1
18
10
4
(W2)
(P3)
14(S3)
15
(S2)
23
(S2)
22
(S2)
10
(S2)
11
(S2)
3
(S2)
4
(S2)
24
(S2)
5
(S2)
12
(S2)
34
(S2)
27
(S2)
28
(S2)
(P7)
ADJ.
NUT
32
(S2)
33
(S2)
26
(S2)
30
(S2)
25
(S2)
29
(S2)
(W1)
(W1)
(W1)
(W1)
(W1)
COLOR
(W3)
(P6)
(W1)
31(S2)
20
(S2)
18
(S2)
21
(S2)
17
(S2)
7(S2)
9(S2)
8(S2)
6(S2)
19
(S2)
13
(S2)
(W1)
16
(S2)
Fig. 2-14-1
Содержание HR-DVS2EK
Страница 5: ......
Страница 41: ...2 20 ...