Page 5
© JVA Technologies www.jva-fence.com
JVA WA190
Deployment and Orientation
1.
Unpack the solar kit from it’s packaging. Look inside the packaging for a set
of U-Bolts.
2.
Remove the U-Bolts from the zip lock bag and mount it to the top and bot
-
tom panel of the bracket.
(A) U-Bolt x 2 (B) Top or Bottom Panel
(C) Washers x 4 (D) Spring Washers x 4 (E) Hex Nut x 4
Содержание PTE2705
Страница 9: ...Page 9 JVA WA190 Overview...