Page 7 of 16
SC 0081 U
Commissioning
3.5 Mounting of Smart Control
Fig. 4: Mounting of Smart Control
8 Openings for wall mounting
9 Smart Control locking screws
•
Place the openings for wall mounting (8) on the Smart Control on the fixing hooks (2) on the adapter.
(fig. 2 and fig. 4)
To do this, place the openings for wall mounting above the hooks and engage them downwards.
•
Fasten the Smart Control to the adapter on the underside with a total of two locking screws (9). (fig. 4)
4 Commissioning
4.1 Switching on
After connecting, the device is switched on automatically and the operating system is started.
After the start-up process, you must make the settings for commissioning.
4.2 Settings – Overview of the menu structure
- General
- Language
- Date/time
- Design
- Display
- Advanced
- System password
9
8
8
9
8
8