![Juniper SSR130 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/juniper/ssr130/ssr130_hardware-manual_2032542019.webp)
Site Preparation Checklist for SSR130
The checklist in
summarizes the tasks you need to perform when preparing a site for
SSR130 installation.
Table 7: Site Preparation Checklist
Date
Performed by
For More Information
Item or Task
Environment
“Environmental Requirements and
Verify that environmental factors such as
temperature and humidity do not exceed
appliance tolerances.
Power
Measure distance between external power
sources and installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
“Rack Requirements for SSR130”
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the appliance.
Plan rack location, including required space
clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk
Verify that the desk meets the minimum
requirements for the installation of the
appliance.
19
Содержание SSR130
Страница 1: ...SSR130 Hardware Guide Published 2022 01 17...
Страница 7: ...1 CHAPTER Overview SSR130 Appliance Overview 8 SSR130 Chassis 10 LTE Support on SSR130 15...
Страница 49: ...3 Verify that all four Device interfaces are up 49...
Страница 55: ...Lithium Battery Declaration 88...
Страница 57: ...57...
Страница 61: ...Restricted Access Warning 61...
Страница 73: ...Unterminated Fiber Optic Cable Warning 73...
Страница 79: ...Jewelry Removal Warning 79...
Страница 82: ...Operating Temperature Warning 82...