7. Bring the line card online:
user@switch> request chassis fpc slot slot-number online
You can install the optional cable management kit after the card is installed.
SEE ALSO
Power Requirements for QFX10000 Components
Installing the QFX10000 Cable Management System
The QFX10000 cable management system is an optional kit that can be ordered to organize and protect
optical cabling attached to the line cards. After a card is installed, you can still remove the line card
without needing to remove the cable management system.
Ensure that you have the following parts and tools available to install the QFX10000 cable management
system on a line card:
• Phillips (+) screwdriver, number 2
To install the cable management system (see
1. Open the shipping carton for cable management system and check that you have:
• Two handle extensions
• One cable tray
Figure 190: Cable Management System Components
337
Содержание QFX10016
Страница 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Страница 10: ...Compliance Statements for Environmental Requirements 428 x...
Страница 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Страница 16: ...Figure 1 QFX10016 Front and Rear 5...
Страница 175: ...Installing the QFX10008 into a Rack Mounting a QFX10016 in a Four Post Rack Using a Mechanical Lift 207 164...
Страница 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Страница 266: ...CAUTION Do not bump the output connections If the connection hits a solid object it could damage the power supply 255...
Страница 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Страница 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Страница 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Страница 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...