Tools and Equipment Required for Installation
5
Tools and Equipment Required for Installation
The following tools are needed to install power supplies and modules, and to rack mount the
G10 CMTS chassis:
M2.5 Phillips torque screwdriver
M2.5 flathead torque screwdriver
M3 Phillips torque screwdriver
1/8 in. Allen wrench, or 1/8 in. hex torque screwdriver
M5 Phillips torque screwdriver
#10 Phillips torque screwdriver
#10 flathead torque screwdriver
#12 Phillips torque screwdriver
7/16 in. torque wrench
22-10 AWG crimper/cutter
In addition, the following supplies may be required:
RF cables and adapters
Ethernet cables with RJ-45 connectors
The following equipment is required to configure the G10 CMTS and verify that the RF system
has been setup properly:
PC with asynchronous terminal emulation
RF spectrum analyzer
RF power meter
Содержание G10 CMTS
Страница 4: ... Juniper Networks G10 CMTS Pre Installation Guide iv ...
Страница 6: ...List of Figures Juniper Networks G10 CMTS Pre Installation Guide vi ...
Страница 8: ...List of Tables Juniper Networks G10 CMTS Pre Installation Guide viii ...
Страница 12: ...G10 CMTS Document Set Juniper Networks G10 CMTS Pre Installation Guide xii ...
Страница 27: ... Noise Measurement Methodology 15 Figure 2 Peak Upstream Noise Measurement Example ...
Страница 32: ...Additional Characterization Tables Juniper Networks G10 CMTS Pre Installation Guide 20 ...