Site Preparation Checklist for an EX9253 Switch
summarizes the tasks you need to perform to prepare a site for
installing an EX9253 switch.
Table 22: Site Preparation Checklist
Item or Task
For More Information
Performed by
Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
"Environmental Requirements
and Specifications for an
EX9253 Switch" on page 50
Power
Measure distance between external
power sources and switch installation
site.
Calculate the power consumption and
requirements.
"EX9253 Power System" on
page 27
Calculating the Fiber-Optic
Cable Power Budget for EX
Series Devices
Calculating the Fiber-Optic
Cable Power Margin for EX
Series Devices
Rack or Cabinet
Select the type of rack or cabinet and
verify that it meets the minimum
requirements for the installation of the
switch.
"Rack and Cabinet Requirements
for EX9253 Switches" on page
54