
During initial power-on, the components of the platform run boot code, go through a series of self-diagnostic
tests, and synchronize with each other.
When the tests are complete, use the LEDs on each module to determine the status of the device. Observe
the module LEDs on the front or rear components.
RELATED DOCUMENTATION
Before You Power On the CTP2000 Platform | 115
Powering Off the CTP Platform | 119
Powering Off the CTP Platform
se to power device
1. From the Main Menu, select 5) Node Operations.
2. From the Node Operations Menu, select 10) Powerdown Node.
119
Содержание CTP2000 Series
Страница 1: ...CTP2000 Series Circuit to Packet Platforms Hardware Guide Published 2020 08 31 ...
Страница 8: ...1 PART Overview CTP2000 Series Platform Overview 2 CTP2000 Series Interface Modules 11 ...
Страница 112: ...Installing SFPs in a CTP2000 Module 102 105 ...
Страница 127: ...5 PART Configuration Accessing the CTP2000 Platform 121 ...
Страница 144: ...7 PART Troubleshooting Troubleshooting Power Failures 138 Contacting Customer Support 140 ...
Страница 149: ...Locating CTP Component Serial Numbers 141 Returning CTP Products for Repair or Replacement 136 142 ...