The following points should be noted in the event that the machine needs to be
stored temporarily prior to installation:
•
Do not remove the machine from the packaging or crate.
•
See transportation dimensions for storage dimensions.
•
The permissible floor load must not be exceeded.
•
The storage location must also fulfil the following requirements:
– Dry
– Under cover
– Protected against moisture condensation
– Storage temperature b10°C and +30°C
– Vibration-free
2.7.2
Installation
Installation requirements
•
Note the permissible floor load.
•
Connection and installation requirements. See section 2.1 “Technical data” on
page 25.
•
Make sure sufficient floor space is available. See section 2.3 “Floor space dra-
wing” on page 29.
•
Ensure adequate lighting.
•
The machine must always be installed on a stable, level base. This base must
be free from extraneous vibrations and abrupt shocks of any kind.
•
Keep the machine away from draughts as well as from hot air streams dischar-
ged by other machines.
•
Do not expose the machine to direct sunlight.
If the machine is to be installed by Jung personnel, please store it in
accordance with the conditions described below.
Please heed the points listed below. They are essential in order to
ensure good grinding results and a long machine service life.
Содержание J630D
Страница 6: ......
Страница 7: ...Operating Instructions J630D...
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 18: ......
Страница 20: ......
Страница 30: ......
Страница 34: ......
Страница 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Страница 36: ......
Страница 37: ...J630D 2 Technical data transportation commissioning 26 7 02 31 2 4 Transport dimensions machine only...
Страница 38: ......
Страница 46: ......
Страница 48: ......
Страница 56: ......
Страница 60: ......
Страница 62: ......
Страница 64: ......
Страница 66: ......
Страница 80: ......
Страница 90: ......
Страница 92: ......
Страница 94: ......
Страница 100: ......
Страница 106: ......
Страница 114: ......
Страница 130: ......
Страница 134: ......
Страница 136: ......
Страница 142: ......
Страница 144: ......
Страница 148: ......
Страница 154: ......
Страница 158: ......
Страница 160: ......
Страница 172: ......
Страница 188: ......
Страница 190: ......
Страница 198: ......
Страница 200: ......
Страница 208: ......
Страница 210: ......
Страница 218: ......
Страница 222: ......
Страница 226: ......
Страница 236: ......
Страница 244: ......
Страница 246: ......
Страница 248: ......
Страница 258: ......
Страница 262: ......
Страница 276: ......
Страница 278: ......
Страница 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Страница 290: ......
Страница 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Страница 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Страница 296: ......
Страница 300: ......
Страница 302: ......
Страница 304: ......
Страница 310: ......
Страница 312: ......
Страница 314: ......
Страница 316: ......