BUILDING YOUR TRAMPOLINE
Description:
Safety glasses
Description:
Cross-head screwdriver
Description:
Mallet
Description:
Gloves
WHAT YOU WILL NEED
1.
This is a 2 person build.
2.
Time for build is approximately 2 hours.
3.
Choose a good location:
(wood chippings, sand or grass)
.
(7.3m)
from ground level, away from
wires, trees and other possible hazards.
(2.5m)
around sides, away from walls, fences, structures, tarmac
and other hard surfaces and play areas.
5