background image

BUILDING YOUR TRAMPOLINE

Description:

Safety glasses

Description:

Cross-head screwdriver

Description:

Mallet

Description:

Gloves

WHAT YOU WILL NEED

1.

  This is a 2 person build. 

2.

  Time for build is approximately 2 hours.

3.

  Choose a good location: 

(wood chippings, sand or grass)

.

(7.3m)

 from ground level, away from 

wires, trees and other possible hazards.

(2.5m)

 around sides, away from walls, fences, structures, tarmac 

and other hard surfaces and play areas.

5

Содержание JumpPOD Classic Premium

Страница 1: ...nstructions carefully before attempting to assemble or use this product Keep this user guide in a safe place for future reference Got a Problem building your trampoline Call us on 0344 800 4060 and we...

Страница 2: ...rface at least 2m from any structures or obstructions such as fence garage house overhanging branches laundry lines or electrical wires Inspect trampoline enclosure net before each use Any damaged or...

Страница 3: ...on HalfTurntable 1 Start from the front drop position and push to the left or right with your arms to begin turning your body in the opposite direction 2 Turn your head and shoulders toward the direct...

Страница 4: ...ooling garden outdoor debris landing on it sparks their claws can damage it A trampoline can act like a sail in strong winds It can be blown over which can cause damage to the frame and surrounding ar...

Страница 5: ...loves WHAT YOU WILL NEED 1 This is a 2 person build 2 Time for build is approximately 2 hours 3 Choose a good location wood chippings sand or grass 7 3m from ground level away from wires trees and oth...

Страница 6: ...netting Quantity 1 Description Top Tube with T Connector Quantity 5 Description 7 Springs Quantity 60 Description 6 5 Gold Springs Quantity 10 Description Bottom enclosure poles Quantity 5 Descriptio...

Страница 7: ...entre leg Leg extension Top tube A B 7 25 x Self tapping screws and washers Part K You will also need a cross head screwdriver not supplied Self tapping screw and washer Cross head screwdriver Screw o...

Страница 8: ...ension until it can be slotted into the connection 1 Slot the end of leg extension into the connection 2 Push down on the end of the centre leg to fully inset the leg extension into the T connection R...

Страница 9: ...E This step will require 2 people who must be wearing gloves Slot two of the frame section together as shown in the diagram 9 POD At this point you will need to ensure you can see spring holes in the...

Страница 10: ...of the green webbing V rings as shown Important springs must be slotted on the right way around Green webbing Slot the other end of the spring through POD connector to the right side into one of the s...

Страница 11: ...oline POD connector POD connector O On the right side of each POD connector using Gold Springs Once you have the 5 Green V rings attached continue attaching the rest of the Gold springs to the left si...

Страница 12: ...ire 2 people Lay the frame pad Part H out over the edge of the frame with the ties facing downwards Align the openings in the frame pad with the POD connector s on the frame completed step 4 WARNING T...

Страница 13: ...losure tubes into the open end of one of the top enclosure tubes Align the hole in the bottom enclosure tube with the slot in the top enclosure tube Screw one of the self tapping screws through the sl...

Страница 14: ...connector tubes visible through the slots in the frame pad Assemble the remaining enclosure tubes using the self tapping screws and the cross head screwdriver Slot the remaining enclosure tubes into t...

Страница 15: ...G3 poles Part L 1 x Enclosure netting Part M Lay the enclosure netting out on the trampoline Find the sleeves that run along the top of the enclosure netting Slot the thin sections on the two black G3...

Страница 16: ...enclosure netting You will now join the two ends of the Black G3 will require two people Both people hold two of the poles end sections and walk towards each other to bend the poles into a circle As s...

Страница 17: ...Attach the other exposed sections of the Black G3 pole to the other enclosure tubes in the order shown in the diagram completed step 6 17 5 With the netting hanging on the inside of the enclosure pol...

Страница 18: ...of the cord through the middle of the next V Ring along Now slot the plastic end back through the net and down through the next V Ring Continue to do this until you have used up nearly all the cord t...

Страница 19: ...ck that there area no overhanging objects in the area above the trampoline 7 3m 24ft Before using your trampoline check again that there is enough clearance around it Maintain a clear space of 2 5 met...

Страница 20: ...parts you can email us on customerservice yjeurope co uk or call our Customer Helpline on 0344 800 4060 To help us assist you please provide the following information when calling 12 FT 3 66M JUMPKIN...

Отзывы: