![Jumpking JK7524TBG Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/jumpking/jk7524tbg/jk7524tbg_user-manual_2031420006.webp)
2. Note: This step requires two people.
During this step, you will connect the six leg sec-
tions.
Hold the leg sections in the positions shown.
Insert the top tube into the POD-connector.
Repeat this step until all six leg sections are
connected.
3. Lay the Bed (5) on the ground inside of the
assembled frame.
Note: There are V-rings around the edge of the
Bed (5) and holes around the top of the frame.
During this step, you will attach the Bed to the
frame using the included Springs for holes
on frame (see the inset drawing). Hook a spring to
the Bed(5) and using the spring pulling tool(18),
pull the spring from the Bed to the hole slot in the
trampoline frame with even spring tension.
Attach the springs(4) in the order shown in the
diagram 3. This will help to distribute the tension,
making assembly easier.
Once all of the springs shown in the diagram have
3
5” Spring (4):
During the installation of springs, wear
gloves and protective eye wear (not provided).
1
1
1
1
1
1
2
2
2
2
2
2
2
3
3
3
3
3
3
1
2
3
4
5
6
7
8
9
10
11
12
Bed(5)
POD-Connector
Spring
18
4
Webbing loop
Frame