Jumpking JK146PBH Скачать руководство пользователя страница 28

Back side of Basketball hoop with two clips.

Insert the Zip Tie (Part P) through the hole of

net then tie on Top enclosure pole (Part I).

Part O

STEP 8 : 

ATTACHING THE BASKETBALL HOOP

Zip Tie

Zip Tie

Part

 

O

      

Part

 

P

  

Part

Q

Part

R

You will need the following parts to complete step 8:
1 x Basketball Hoop

 

 - Part O

1 x Zip Tie

 - Part P

1 x Ball

 - Part Q

1 x Inflactor

 - Part R

28

Содержание JK146PBH

Страница 1: ...pting to assemble or use this product Keep this user guide in a safe place for future reference Got a Problem building your trampoline Please contact us at contact jumpking com The trampoline enclosur...

Страница 2: ......

Страница 3: ...RE MODEL JK146PBH 6 7 30 7 If you have questions after reading this manual please email us at contact jumpking com The trained technicians will provide immediate assistance Customer Hot Line 1 877 927...

Страница 4: ...Trampoline over 20 in 51 cm tall are not recommended for use by children under 6 years of age 16 The trampoline is designed for users weighing 90 kg 200 lbs or less 17 Misuse and abuse of the trampol...

Страница 5: ...to crawl under the barrier 39 Do not intentionally rebound o the barrier 40 Do not hang from kick cut or climb on the barrier 41 Wear clothing free of drawstrings hooks loops or anything that could g...

Страница 6: ...any worn defective or missing parts JK146PBH Do not attempt or allow somersaults Serious injuries paralysis or death may result To reduce the chance of landing on your head or neck do not do somersaul...

Страница 7: ...any years of fun and fitness This trampoline enclosure comes equipped with warnings and instructions for the assembly care maintenance and use of the trampoline enclosure This information must be read...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ...loves WHAT YOU WILL NEED 1 This is a 2 person build 2 Time for build is approximately 2 hours 3 Choose a good location wood chippings sand or grass 7 3m from ground level away from wires trees and oth...

Страница 16: ...tion Top enclosure poles Quantity 6 Description Enclosure netting Quantity 1 Description Top Tube with T Connector B Quantity 6 Description Springs Quantity 72 Description Bottom enclosure poles Quant...

Страница 17: ...s Part C 12 x Leg extensions Part D First we will complete one of the four sections of the trampoline frame Slot the narrow end of the top tube with T connector A into T connector B Insert the leg ext...

Страница 18: ...xtension with both hands Pull the extension until it can be slotted into the T connection 1 Slot the end of leg extension into the T connection 2 Push down on the end of the leg center to fully inset...

Страница 19: ...ions Now add the fifth and final section You will now need to slot the frame together this will take some force The easiest method is if the two people face each other Hold the top tubes either side o...

Страница 20: ...facing upwards Locate the 4 V Rings with the colored stitched These will be at 90 to each other Slot one of the springs part F onto one of the color webbing V Rings as shown Important springs must be...

Страница 21: ...e frame using the same method as shown in the previous two steps Attach four more springs to the V Rings in the middle of the four attached points and then attach them to the frame The stitched bed sh...

Страница 22: ...he edge of the frame with the ties facing downwards Align the openings in the frame pad with the T connector B s on the frame Tie the outer elastic straps on the underside of the frame pad around the...

Страница 23: ...tubes Align the hole in the bottom enclosure tube with the slot in the top enclosure tube Screw one of the self tapping screws through the slot in the top enclosure tube and into the hole in the botto...

Страница 24: ...Assemble the five remaining enclosure tubes using the five self tapping screws and the cross head screwdriver completed step 5 Then place the Hemisphere cap Part N onto the top enclosure pole Part I...

Страница 25: ...step 6 Part L 1 x Enclosure netting Lay the enclosure netting out on the trampoline Find the ROD on top of enclosure netting Rod Enclosure netting 25 Stand on the trampoline and insert one of the exp...

Страница 26: ...Attach the three other exposed sections of the rods to the other enclosure tubes in the order shown in the diagram completed step 6 26 5 6...

Страница 27: ...cord through the middle of the next V Ring along Now slot the end back through the net and down through the next V Ring Continue to do this until you have used up nearly all the cord then tie this en...

Страница 28: ...he hole of net then tie on Top enclosure pole Part I Part O STEP 8 ATTACHING THE BASKETBALL HOOP Zip Tie Zip Tie Part O Part P Part Q Part R You will need the following parts to complete step 8 1 x Ba...

Страница 29: ...Also check that there area no overhanging objects in the area above the trampoline 7 3m 24f t Before using your trampoline check again that there is enough clearance around it Maintain a clear space...

Страница 30: ...17 to 27 30...

Страница 31: ......

Страница 32: ......

Отзывы: