18
5.3 Pressure connection
Tightness
_________________________________________________________________________
Using joints and material of appropriate shape , for eg. according to
EN 837 and DIN 16258 !
After the establishment of the connection to the process, the tightness must be
checked!
If the pressure switch is screwed into a tapped orifice, must to use the total
length of the filetage of pressure converter must be used.
_________________________________________________________________________
The couple depends on the size, material and shape of the seal used and of
taking pressure of the pressure converter.
Do not make use of the casing of a pressure switch in order execute a tightening
the process connection but use a key on the flat. (opening of key : 17 mm)
Содержание 405071
Страница 4: ...4 ...
Страница 12: ...12 3 3 Dimensions 3 3 1 Dimensions ...
Страница 14: ...14 3 3 3 Process connection ...
Страница 23: ...23 8 Appendix ...
Страница 24: ...24 ...
Страница 25: ...25 ...
Страница 26: ...26 ...
Страница 27: ...27 ...
Страница 28: ...28 ...
Страница 29: ...29 ...
Страница 30: ...30 ...
Страница 31: ...31 ...
Страница 32: ...32 ...