– 10 –
5) Put the cable gland lid on the cable. Pass the
cable through the cable gland.
Insert the lid slightly into the gland.
Slightly insert
Switch terminal block
No.2
No.4
6) Insert the power cables into the switch terminal
block and secure them with the screws.
Inset the blue cable into terminal No. 2. Insert
the brown cable into terminal No. 4.
7) Pull out the left and lower remaining cables from
the power supply box. Put the switch in the pow
-
er supply box and tighten the setscrews.
8) Place the excess cables inside the table stand
and secure the table stand front cover.
Setscrew
Setscrew
Lid
Lid
Front cover of the table stand
Lid