– 6 –
❺
❻
❼
❽
❸
❹
○
Remove setscrews
4
and
5
from the thread tension cover.
Remove the thread tension cover.
○
Remove setscrews
6
to
!0
from the spool cover.
○
Remove the bobbin winding motor junction cable from the junction connector.
○
Remove the spool cover from the main unit of the machine, paying attention to
the base tension.
4) Spool cover
Base tension
○
Remove setscrews
❾
to
of the bottom cover B (on the handwheel side) to
detach the bottom cover B.
○
Remove setscrews
to
of the bottom cover A (on the frame side). Draw
out the bottom cover A in the direction of the arrow while pushing up the tip of
the cover.
5) Bottom cover
Junction connector
❾
Содержание HZL-NX7
Страница 1: ...SERVICE MANUAL HZL NX7 COMPUTER SEWING MACHINE ...
Страница 39: ......