JUDO QUICKSOFT-UNO
13
Operation
5.
Operation
ATTENTION
(see chapter on “Safety information and
dangers due to non-compliance”)
Always observe the chapter on “Intended
Use”!
5.1
Commissioning
activate
regeneration
:
–
The Softener is connected to the water
system. The bypass valve is in the "By-
pass" position.
–
Fill the regeneration salt into the salt
container (
5
). The water dissolves the
regeneration salt producing saturated
brine . The regeneration salt must at
least conform to food quality standards
and should fulfil the requirements ac-
cording to DIN EN 973.
–
Our recommendation:
Broxo or Solvay
salt, either as a block, tablets or coarse
grains 7 - 15 mm. If you use other regen-
erating salts, the salt container
(
5
) must
be cleaned at shorter intervals and the
intake screen (
88
) replaced more often.
–
Pour approx. 4 litres of water into the salt
container (
5
).
–
Remove the cover (
2
).
–
Enter the installation date on the label of
the operating cylinder (
36
) and in the
“servicing record sheet”.
–
Set the raw water hardness (
°
e) at the
electrical circuit (see chapter on “Setting
the required mixed water hardness”).
–
Open the water inlet. Open the bypass
valve.
ATTENTION
For safety reasons the Softener must be
vented immediately
after it is connected to
the water system (bypass valve is open).
The system is automatically vented during
the first regeneration (see chapter on “Com-
missioning”).
–
After each connection to the power sup-
ply the electronics automatically perform
a self-test for approx. 10 seconds. After
this has been successfully completed all
the control lamps briefly light up The sys-
tem control lamp (
13
) then lights up.
–
Trigger
regeneration
manually: Press
the regeneration trigger (
18
). At the
same time you can check whether the
system is functioning correctly (see
chapter on “Servicing/Repair”).
After completing the regeneration the
Softener is ready for use (approx.9 min-
utes).
The intake time should be at least 30
seconds (digit 2 can be seen on the driv-
ing wheel (
11
)). If the intake time is
shorter, water must be poured into the
salt container (
5
). Filled level 10 – 11 cm
above the floor of the container. Start a
new regeneration and check the intake
time.
–
Mix in hard water using the setting screw
of the blending valve (
10
) (see chapter
on “Setting the blending”).
–
Fit the cover (
2
).
Connect the Softener to the
power supply. Plug the power
pack into the socket.
Содержание QUICKSOFT-UNO
Страница 3: ...JUDO QUICKSOFT UNO 3...
Страница 26: ...26 JUDO QUICKSOFT UNO JQS U Spare Parts...
Страница 27: ...JUDO QUICKSOFT UNO 27 JQS U Spare Parts...