background image

Attention:
Carefully read through the instal-
lation and operating instructions 
and safety information before 
installing and putting the unit into 
service.
These must always be issued to 
the owner/user.

Extended warranty peri-
od if a service agreement 
is concluded!

 

Installation and Operating 
Instructions

JUDO QUICKSOFT-UNO

Softener

Valid for: EU countries and Switzerland

Language: English

Fig.: JQS-U

Содержание QUICKSOFT-UNO

Страница 1: ...ion before installing and putting the unit into service These must always be issued to the owner user Extended warranty peri od if a service agreement is concluded Installation and Operating Instructi...

Страница 2: ...cted and registered trademarks of the respective hold er JUDO Wasseraufbereitung GmbH D 71351 Winnenden All rights reserved Reprints even of extracts is only permitted with special approval Dear Custo...

Страница 3: ...JUDO QUICKSOFT UNO 3...

Страница 4: ...st be permanent ly available at the place in which the Soften er is used This instruction manual is intended to make it easier to familiarize yourself with the Sof tener and its possible intended uses...

Страница 5: ...y information and dan gers due to non compliance In detail failure to observe the general dan ger symbols can result for example in the following risks Failure of important functions of the Softener D...

Страница 6: ...ng the in struction manual The manufacturer supplier must always be consulted before using the Softener outside the use limitations given in the instruction manual The Softeners are only to be used in...

Страница 7: ...dangers 2 2 1 Electrical equipment installa tions Electrical devices equipment which are not splash proof and which are located near the Softener can be damaged by water which escapes from the Softene...

Страница 8: ...g des Gas und Wasserfaches e V technical scientific association for the gas and water industries in accordance with the requirements of DIN 19636 pressure class PN10 for Softeners cation exchangers in...

Страница 9: ...unit is installed must be dry and frost free Unauthorised persons must not have ac cess to the Softener ATTENTION see chapter on Safety information and dangers due to non compliance The ambient tempe...

Страница 10: ...nstallation height depends on the pipe layout The minimum installation height from the floor to the rotary flange is 40 cm The built in rotary flange must be in stalled in the direction of flow This i...

Страница 11: ...the unit or to the side if there is a large space between the pipe and wall The installation should be carried out depending on the local circumstances so that the hand lever a is easily accessible s...

Страница 12: ...neration wastewater and the back up overflow must both be laid up to the wastewater sewer without any kinks Ensure free discharge above the wastewater channel or floor drain The wastewater hose with a...

Страница 13: ...ed water hardness Open the water inlet Open the bypass valve ATTENTION For safety reasons the Softener must be vented immediately after it is connected to the water system bypass valve is open The sys...

Страница 14: ...the raw water hardness is set using the DIP switch 21 contacts 1 to 4 see Fig 10 The allocated contact is moved downwards to make an adjustment Example raw water hardness 26 e Push contact 2 of the DI...

Страница 15: ...aw water hardness and the mixed water hardness set In accordance with the Drinking Water Reg ulations of 1 1 2003 the limit value for sodi um in drinking water is 200 mg l This does not apply to miner...

Страница 16: ...regeneration is carried out with eco nomic salt used according to DIN 19636 Here diluted brines sodium chloride are used to remove the hardness constituents from the resin again With the regeneration...

Страница 17: ...filled in good time the Softener switches to economy opera tion The brine stocks still available are primarily used for disinfecting the ion exchange resin and the softening effect is reduced In this...

Страница 18: ...the Softener must be depressu rised Failure to observe this can lead to an uncontrolled escape of water and therefore lead to water damage in the building Strictly comply with the instructions given i...

Страница 19: ...ee chapter on Commissioning Late salt refill During regeneration the driving wheel was man ually turned The drive turns the driving wheel until the normal operating position is reached again Then the...

Страница 20: ...973 Hygienic care is required when refilling salt For example the salt packages should be cleaned before use so that contaminations cannot get into the salt solution container The regenerating salt mu...

Страница 21: ...ts to DIN 19636 The maximum operating pressure is lower in or der to ensure the optimum function of the Softener Operating pressure Nominal pressure 2 7 bar PN 10 Operating weight when filled with sal...

Страница 22: ...hardness of 10 e depending on the volumetric flow rate Fig 12 Pressure loss in normal operating position Max possible quantity drawn off daily depending on the raw water hardness and a mixed water ha...

Страница 23: ...10 e depending on the raw water hardness Fig 14 Wastewater quantity Salt consumption related to 1 m of mixed water with 10 e depending on the raw water hardness Fig 15 Salt consumption Wastewater l m...

Страница 24: ...n resistant pipes should be laid In the case of water with partial soften ing approx 10 e zinced pipes and copper pipes can be laid Our recommendation Install a JUDO JULiA metering pump in the mixed w...

Страница 25: ...JUDO QUICKSOFT UNO 25 JQS U Spare Parts 10 JQS U Spare Parts 1 3 148 9 6 103 88 7 2 26 4 5 80 106 17 16 15 12 13 14 24 20 25 11 18 112 28 23 10 36...

Страница 26: ...26 JUDO QUICKSOFT UNO JQS U Spare Parts...

Страница 27: ...JUDO QUICKSOFT UNO 27 JQS U Spare Parts...

Страница 28: ...Switch over display yellow 15 Regeneration display green 16 Trouble display red 17 Service display green 18 Manual pushbutton to trigger regeneration 19 VSV screw upper part 1 112 0345 6 20 Setting R...

Страница 29: ...75 Control housing cover 1 112 0274 41 76 O ring 53x3 1 120 0185 2 77 O ring 40x3 1 120 0151 1 78 Driving slide ring 1 142 0022 2 79 Driver 1 220 0503 65 80 Wall support complete 1 2200500 11 86 Rate...

Страница 30: ...716 21 148 Flexible hose 1 220 0722 170 160 Spare parts kit for solenoid valve 1 220 0580 63 161 Spare parts kit for drive 1 220 0581 254 162 Spare parts kit for overflow valve 1 220 0418 64 163 Spare...

Страница 31: ...time2 minutes approx 3 minutes Wastewater pro duced litres approx 3 5 litres Rinse3 3 4 5 litres Initial filtrate4 2 5 4 litres 1 Is completed by the customer service department S Total sum L extende...

Страница 32: ...line be www judo online be JUDO Austria Unter den Linden 32 A 2000 Stockerau Tel 43 0 2266 6 40 78 Fax 43 0 2266 6 40 79 e mail info judo online at www judo online at Installed by JUDO HEIFi KOM Combi...

Отзывы: