Judo JPM Скачать руководство пользователя страница 10

10

JUDO PROMI

Installation

4.1.4 Installing the domestic water 

station

The built-in rotary flange for the filter is sup-
plied with bayonet drill holes. The necessary
seals and screws for this filter have already
been mounted.

Do not unscrew the screws!

Insert the four flange screws in the bay-
onet drill holes on the built-in rotary
flange (see fig. 2 I).

Turn the filter in a clockwise direction as
far as it will go (see fig. 2 II).

Tighten the four flange screws.

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

The section of the profiled flange gasket
must point towards the built-in rotary flange.
Failure to observe this can lead to leaks and
water escamping. This can in turn cause wa-
ter damage (see fig.3).

4.2

Discharging backwash water

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

An adequately dimensioned wastewater
connection (e.g. floor drain) must be avai-
lable for the backwashing water.

The dimensions depend on the local circum-
stances (e.g. wastewater pipe gradient,
number of pipe bends, length of the waste-
water pipe, etc.). The dimensioning must at
least allow all the wastewater to be dis-
charged at the same time.

 

If it is not possible

to provide a wastewater connection directly
beneath the filter, the flushing water can be
fed several meters to the next wastewater
connection, either through a hose or a pipe
to be fitted to the flushing water valve. This
pipe must have the same dimension as the
flushing water valve.

In all options, a free discharge must be en-
sured (air gap/ air break).

The following points must be noted if a buck-
et is used for backwashing:

If the water mains pressure is high, wa-
ter can splash out of the bucket. In this
case, damage to property close to the fil-
ter is possible.

When the bucket is half-filled the back-
washing process must be stopped. Oth-
erwise it is possible for the bucket to
overflow. Therefore the bucket must be
adequately sized and the backwashing
should be carried out quickly.

Fig. 2:

Built-in rotary flange with bayonet fixture

Select the torque (approx. 4 Nm) 
so that the gasket closes and the 
filter is not damaged or strained!

Fig. 3:

Built-in rotary flange

I

II

Profiled flange gasket

Содержание JPM

Страница 1: ...structions as well as all safety information before installing and putting the unit into service These Instructions must always be issued to the owner user Installation and Operating Instructions JUDO...

Страница 2: ...prevention The JUDO PROMI is suitable for use in COLD water applications only up to a water temperature of maximum 30 C 86 F and up to a water pressure of maximum 16 psi It filters out all coarse and...

Страница 3: ...heater Water heaters can and will transmit heat back through its respective plumbing Always ensure that this product is installed so that the water temperature never exceeds a maximum of 30 C 86 F fo...

Страница 4: ...4 JUDO PROMI...

Страница 5: ...y available at the place in which the filter is installed and used This instruction manual is intended to make it easier to familiarize yourself with this filter The instruction manual contains import...

Страница 6: ...can result for example in the following risks Failure of important functions and features of this product Danger to persons due to electrical and mechanical conditions Danger to property and the envi...

Страница 7: ...ructions The manufacturer supplier should be consulted prior to any operation of the filter other than in the operational areas stated in these operating instructions The filter may only be operated i...

Страница 8: ...of DIN 50930 6 Impact on the Drinking Water Quality 4 Installation 4 1 General ATTENTION see chapter Safety information and dangers due to non compliance The unit may only be installed by skilled per...

Страница 9: ...ertical position 5 Non observance of this can cause uncon trolled leakage of backwashing water and can result in water damage 4 1 3 Mounting the built in rotary flanges Install using the supplied buil...

Страница 10: ...ances e g wastewater pipe gradient number of pipe bends length of the waste water pipe etc The dimensioning must at least allow all the wastewater to be dis charged at the same time If it is not possi...

Страница 11: ...Installation 4 2 1 Backwashing water discharge options JPM 1 JPM 1 2 Abb 4 Backwashing water discharge options min 10 l 200 mm 8 inch min 10 l 200 mm 8 inch 25 mm 1 inch 40 mm 1 5 inch 25 mm 1 inch 4...

Страница 12: ...heel It uses an acoustic alarm as a reminder that every two months the filter needs to be back washed maximum backwash intervals Activation Lift the lid of the handwheel Insert the two batteries in th...

Страница 13: ...reducer 6 The set outlet pressure can be read off on the outlet pressure gauge 7 Then the filtered water runs out of the domestic water station via the built in rotary flange 1 1 Built in rotary flan...

Страница 14: ...rinsing valve Step 2 turn hand wheel 2 clockwise until stop point to close rinsing valve During a backwash the suction control arms create a reverse flow action at each nozzle piece resulting in a vac...

Страница 15: ...to check batteries regu larly to ensure they have not been exhausted The beep is only considered an additional reminder for backwashing Independent of that the backwashing needs to be carried out eve...

Страница 16: ...after replacement has been made 5 6 Stoppages ATTENTION see chapter Safety information and dangers due to non compliance If a filter has to be removed from the flange or unscrewed the chapter Intende...

Страница 17: ...flushing valve Lack of water pressure Screen is blocked Carry out backwashing Leaks in the backwash protective filter Inform the fitter or nearest cus tomer service centre The filter cover must be rep...

Страница 18: ...rval is restarted Used batteries are to be returned to a distributor or to one of the returning faci lities established to this purpose by the public recycling entities ATTENTION see chapter Safety in...

Страница 19: ...filter The backwashing volumetric flow given ap plies to 2 4 psi mains pressure and for a completely opened flushing water valve Models Order no JPM 8170200 JPM 1 8170201 JPM 1 8170202 JPM 1 8150107 J...

Страница 20: ...pipe centre E Depth to pipe centre F Connection dimension waste water Fig 6 Installing dimensions JPM 1 built in rotary flange horizontal piping built in rotary flange vertical piping Models A B C D...

Страница 21: ...domestic water station Installation and operation instructions JPM 1 1 x built in rotary flange JQE 1 or 1 with bayonet type connection and screw connection 2 x batteries to be used in the Memory Ele...

Страница 22: ...22 JUDO PROMI Spare Parts 10 Spare Parts 10 1 JPM 1...

Страница 23: ...3 Type plate 1 1701915 10 Cylinder Screw M6x40 6 1650123 11 Flange ring 1 2010382 12 Filter housing 1 1120289 13 O ring 10x3 2 1120332 14 Carrier 1 2010146 15 Suction Pipe Gasket 1 1607410 16 Mouthpie...

Страница 24: ...ometer seal 2 1200117 38 O ring 14 5x2 5 4 1200231 39 Pressure gauge tube 2 1120349 40 manometer 0 10 psi Subsequent Pressure 1 2170121 41 manometer 0 16 psi Primary Pressure 1 2170120 42 Hollow screw...

Страница 25: ...JUDO PROMI 25 Spare Parts 10 2 JPM 1 2...

Страница 26: ...15x3 2 1 1607420 10 O ring 28x2 5 1 1200027 11 Carrier 1 2020034 12 Mouthpiece Nozzle 2 1607104 13 Suction Pipe Gasket 1 1607113 14 Plate Screw C3 5x13 1 1607114 15 Complete Suction control Assembly...

Страница 27: ...42x2 7 1 1200143 34 Protection cap 1 1440082 35 Profile flange seal 1 1200230 36 Cylinder Screw M8x140 4 1650376 37 Washer A 8 4 4 1607125 38 Hexagonal nut M8 4 1607117 Spare part set consisting of It...

Страница 28: ...DO Waterbehandeling GmbH Filiaal Filiale BeNeLux Laerbeeklaan 72 A1 72 A1 Avenue du Laerbeek B 1090 Brussel Bruxelles Tel T l 32 0 24 60 12 88 Fax 32 0 24 61 18 85 e mail info benelux judo eu www judo...