13-23
Section 13 Setting up the Operation Mode
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
APP A
APP B
13.16 Setting Datum Conversion
Set for conversion of datum to the Japanese datum.
[Operation procedure]
Open the datum conversion setting screen by performing the following menu operations.
[Menu] button
→
Settings
→
Geodetic
Setting Item
Description of Setting
Setting Value
Convert WGS-84 to
Tokyo Datum
Enable/disable the data conversion function.
Disable: Received data is used without performing
datum conversion for the own ship’s latitude and
longitude and received AIS latitude and longitude.
Enable: When the datum of the own ship’s latitude
and longitude is WGS-84 or no DTM sentence has
not been received, own ship’s latitude and longitude
are converted to the Japanese datum.
The AIS latitude and longitude are converted to the
Japanese datum regardless of own ship’s latitude
and longitude.
To enable: Select
To disable: Clear
Except Own Ship’s
LAT/LON
Set enable/disable to exclude own ship's latitude
and longitude from the target of geodetic
conversion.
Enable: Own ship's latitude and longitude are not
converted to geodetic.
Disable: Own ship's latitude and longitude are
converted to geodetic.
When Convert WGS-84 to Tokyo Datum is enabled,
this setting is valid.
To enable: Select
To disable: Clear
Содержание JMR-5410-4X
Страница 2: ......
Страница 22: ...xx NQE 3167 Power Control Unit NCT 4106A NSK Unit NBA 5111 Rectifier Warning Label Warning Label Warning Label ...
Страница 25: ...xxiii NKE 2255 7 9 6HS Scanner Unit Warning Label ...
Страница 27: ...xxv NKE 2103 4 4HS Scanner Unit NKE 2103 6 6HS Scanner Unit NKE 2255 7 9 6HS Scanner Unit ...
Страница 54: ...Contents 20 ...
Страница 68: ...Section 1 Overview 1 14 Outline Drawing of Radar Antenna NKE 2632 A ...
Страница 70: ...Section 1 Overview 1 16 Outline Drawing of Radar Antenna NKE 2043 NKE 2043 ...
Страница 72: ...Section 1 Overview 1 18 Outline Drawing of Radar Antenna NKE 2103 4 4HS ...
Страница 74: ...Section 1 Overview 1 20 Outline Drawing of Radar Antenna NKE 2255 7 ...
Страница 76: ...Section 1 Overview 1 22 Outline Drawing of Radar Antenna NKE 2255 6HS ...
Страница 78: ...Section 1 Overview 1 24 Outline drawing of 19inch Display NWZ 214 NWZ 214 ...
Страница 80: ...Section 1 Overview 1 26 Outline Drawing of Process Unit NDC 1678 NDC 1678 ...
Страница 82: ...Section 1 Overview 1 28 Outline Drawing of Trackball Operation Unit NCE 5605 Option ...
Страница 84: ...Section 1 Overview 1 30 Outline Drawing of Junction Box NQE 1143 ...
Страница 86: ...Section 1 Overview 1 32 Outline Drawing of 19inch Desktop Frame CWB 1659 ...
Страница 88: ...Section 1 Overview 1 34 Outline Drawing of Interswitch Unit NQE 3141 8A Option ...
Страница 126: ......
Страница 214: ...Section 4 Range and Bearing Measurement Methods 4 32 ...
Страница 244: ...Section 5 Basic Operation of the Radar 5 30 ...
Страница 324: ...Section 8 Monitoring a Dragging Anchor 8 8 ...
Страница 374: ...Section 11 Setting up Screen View 11 20 ...
Страница 380: ...Section 12 Setting up Alerts 12 6 Polygon tab Set a polygon alarm issuing range This function cannot be used now ...
Страница 520: ...Section 15 Maintenance Inspection 15 70 ...
Страница 546: ...Section 16 Failures and After Sale Services 16 26 ...
Страница 590: ...Appendix A Radar Antenna Display Unit Block Diagrams A 8 A 1 8 NKE 2255 7 9 6HS ...
Страница 592: ...Appendix A Radar Antenna Display Unit Block Diagrams A 10 A 1 10 NKE 2063A ...
Страница 596: ...Appendix A Radar Antenna Display Unit Block Diagrams A 14 A 2 3 NCE 5794 operation unit ...
Страница 622: ...Appendix D Menu List and Materials D 8 Tools VHF Call VHF1 Call VHF2 Call VHF3 Call ...
Страница 687: ......