PREPARATION FOR INSTALLATION
2-6
Installation of cable through the hull: In cases where the cable passes through the wall or
deck, install the through hull fitting at a suitable point and weld as appropriate.
(Standard AIS installation condition.)
The installation of a pole that can not be weld is a temporally, therefore when the weld can
be carried out, weld the handrail and the deck by a ship owner or a dockyard and then
complete the installation.
High handrail example 1
High handrail example 2
Low handrail example 1
Low handrail example 2
Содержание JHS-183
Страница 2: ... ...
Страница 33: ...CONFIGURATION AND SPECIFICATIONS 1 21 1 4 2 Overall configuration ...
Страница 57: ...INSTALLATIONS 3 7 3 1 1 3 Connection procedure of N type coaxial connector 1 Parts N P 10U 2 Tools ...
Страница 58: ...INSTALLATIONS 3 8 3 Procedure 1 2 3 4 5 6 7 8 9 ...
Страница 59: ...INSTALLATIONS 3 9 10 11 12 13 14 15 ...
Страница 60: ...INSTALLATIONS 3 10 16 17 18 19 20 ...
Страница 61: ...INSTALLATIONS 3 11 21 22 23 24 ...
Страница 82: ...INSTALLATIONS 3 32 3 1 7 NQE 422A Junction box Unit mm Weight Approx 0 4kg Color 7 5BG 7 2 ...
Страница 84: ...INSTALLATIONS 3 34 ...
Страница 87: ...APPENDIX 4 3 4 1 2 NCM 983 AIS CONTROLLER 4 1 2 1 CHASSIS ...
Страница 88: ...APPENDIX 4 4 4 1 2 2 BLOCK DIAGRAM FPC 26 A K ...
Страница 101: ......