
85 | Appendices
4.2 Appendix B: Checklist for Taking DP system into Operation
Before taking the DP2 system into operation perform items as listed in Table 8: DP system Operation Checklist on page
85:
Item
Description
OK
☑
1
No (unacknowledged) alarms are present.
☐
2
system is not in simulation mode.
☐
3
PMS is in DP2 configuration.
☐
4
The AlphaDynaPos DP system should be in a healthy condition. The system's health is indicated on
the DP Operator Panel.
☐
5
On Sensor screen 2 MRU sensors must be selected.
☐
6
On Sensor screen 2 Gyro sensors must be selected.
☐
7
On Sensor screen 2 Wind sensors must be selected.
☐
8
On Position Sensor page 2 DGPS sensors must be selected.
☐
9
On Position Sensor page, Laser sensor must be selected if within reach of reflector.
☐
Table 8: DP system Operation Checklist
Содержание Alphatron Marine AlphaDynaPos
Страница 1: ...AlphaDynaPos Ship Automation and Navigation system Operation Manual www jrc am ...
Страница 5: ...5 Contents 4 2 Appendix B Checklist for Taking DP system into Operation 85 ...
Страница 13: ...13 Introduction III 3 System Overview DP2 Figure 2 system Overview DP2 ...
Страница 14: ...14 Introduction III 4 Sensor Overview Figure 3 Sensor Overview ...