PTG-10 Operations Manual
2-2
Interoperability Now!
Plainly, mark with indelible ink all mailing documents as follows:
GOODS RETURNED FOR REPAIR
Mark all sides of the package:
FRAGILE - ELECTRONIC EQUIPMENT
Inspect the package prior to shipment to be sure it is properly marked and securely wrapped.
2.4 Installation Overview
Three quick and simple steps are needed to properly install the PTG-10. These steps are:
1. Provide mechanical mounting for the unit
2. Provide the proper DC power for the unit.
3. Interconnect the unit with the communications system via the unit’s JP1 connector.
The PTG-10 is then ready to begin normal operation.
2.5 Installation Considerations
Careful attention to the following installation suggestions should result in the best unit/system
performance. Figure 2-1 provides overall unit dimensions.
The PTG-10 must be installed in a structure that provides both protection from the weather and
assurance of ambient temperatures between -10 and +55 degrees C. Since the unit is neither
splash proof nor corrosion resistant, it must be protected from exposure to salt spray.
NOTE: The PTG-10 is designed to be mounted in a standard EIA 19" wide rack
by means of attaching the unit to the rack on either side or bolting three units
together to span the entire rack. Screws are provided in the accessory kit for
securing the unit to the rack via the front panel.
2.6 Power Requirements
The PTG-10 is designed to operate from +11 to +15 VDC. Power consumption is 0.5 VA typical.
Содержание PTG-10
Страница 8: ...PTG 10 Operations Manual 1 4 Interoperability Now Blank Page ...
Страница 14: ...PTG 10 Operations Manual 2 6 Interoperability Now Figure 2 2 Locations of Indicators and Adjustments ...
Страница 16: ...PTG 10 Operations Manual 3 2 Interoperability Now Blank Page ...
Страница 18: ...PTG 10 Operations Manual 4 2 Interoperability Now Blank Page ...
Страница 24: ...PTG 10 Operations Manual 5 6 Interoperability Now Blank Page ...
Страница 26: ...PTG 10 Operations Manual 6 2 Interoperability Now Blank Page ...