9. OPERATION INSTRUCTION
WARNING-Do not attempts to start or operate the engine until completely familiar with
the location and use of each control necessary to operate this vehicle. Operator must
know how to stop this machine before starting and driving it.
Control pedal
1)
Accelerator Pedal:
Changes engine rpm and vehicle ground speed. Press down on
the accelerator pedal with your foot to increase speed and let up on the pedal to
decrease speed. (See figure 1)
Each time prior to starting the engine, check the throttle assembly to ensure
that when pedal is pushed all the way forward the assembly is working
smoothly and returns to idle when released. Do not operate if pedal or engine
throttles linkage fail to return to idle. If unable to correct the problem through
lubrication, adjustment or replacement of worn parts, contact your dealer for
assistance.
2)
Brake Pedal:
Applying pressure to the brake pedal instead of the accelerator pedal
with your foot will slow down and/or stop the vehicle. Riding or resting your foot on the
pedal unnecessary will wear the brakes out prematurely. (See figure 1)
3) Clutch Pedal:
Applying pressure to the clutch pedal with your left foot will make
gearbox
to declutch and let up the pedal to clutch. (See figure 1)
Park brake lever and shift selector
4)
Park Brake Lever
: Sets and releases the park brakes. Do not drive vehicle with park
brake lever set. Indicator light will illuminate indicating park brake is engaged. (See
Accelerator Pedal
Brake Pedal
Clutch Pedal
FIGURE 1
Содержание JNSZ1100SV
Страница 3: ...Warranty policy...
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 35: ......
Страница 37: ...13 ENGINE WIRING DIAGRAM...
Страница 86: ...85 16 ELECTRIC INJECTION SYSTE...
Страница 87: ...86...
Страница 88: ...87...
Страница 89: ...88...
Страница 90: ...89...
Страница 91: ...90...
Страница 92: ...91...
Страница 93: ...92...
Страница 94: ...93...
Страница 95: ...94...
Страница 96: ...95...
Страница 97: ...96...
Страница 98: ...97...
Страница 99: ...98...
Страница 100: ...99...
Страница 101: ...100...
Страница 102: ...101...
Страница 103: ...102...
Страница 104: ...103...
Страница 105: ...104...
Страница 106: ...105...
Страница 107: ...106...
Страница 108: ...107...
Страница 109: ...108...
Страница 110: ...109...
Страница 111: ...110...
Страница 112: ...111...
Страница 113: ...112...
Страница 114: ...113...
Страница 115: ...114...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 121: ...120...
Страница 122: ...121...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 126: ...125...
Страница 127: ...126...
Страница 128: ...127...
Страница 129: ...205 DEALER PRE DELIVERY INSPECTION...
Страница 132: ...208 entering into performing this contract...