14
15
Monthly
JOPRO Transfer should be super-
vised regarding:
-
function:
check that the various
functions work correctly.
-
deformations:
check that there
are no visible cracks, distortions,
corrosions or other deformations.
-
weldings:
check that all weld-
ings are intact and have no visible
cracks.
-
markings:
check that the marks
for maximum capacity, CE and
contact information to the manufac-
turer are intact.
-
instructions:
check that the
manual is always available.
Daily
Hydraulic cylinders
Set the cylinders to min and max
position and let the oil flood through
the system 2 minutes at each posi-
tion to ensure parallelity.
Repeat the procedure 2-3 times.
If any problems with the cylinders
still occur, please contact us.
2 minutes
2 minutes
Содержание Transfer
Страница 1: ...JOPROTransfer ENGLISH...
Страница 7: ...7 Moves JOPRO Transfer along the guiding rail Raises and lowers the roller bed...
Страница 9: ...9 Turns the electromagnet 180 left and right...
Страница 11: ...11 The electromagnet must be cen tered on the battery The rollers must be on the same level...
Страница 13: ...13 Transport the battery so far onto the roller bed that it rides on the battery brake pads...
Страница 18: ...18 L2 L1 Spare Parts JOPRO Transfer Mechanics 020 0101 020 5001...
Страница 19: ...19 050 0306 050 0201 050 0202 040 0802 040 0401 040 0503 040 0402 040 0504...
Страница 24: ...24...
Страница 25: ...25...
Страница 26: ...26...
Страница 28: ...Jopro AB Lunnav gen 6 Tel 46 303 749740 info jopro com SE 449 50 Alafors www jopro com ver 1 1 Jun 2019...