background image

PREPARATION 

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware 

contents list.  If any part is missing or damaged, do not attempt to assemble the product.

Estimated Assembly Time: 6 minutes.

PLEASUE USE TYPE"B" BULB MAX 40-WATT OR CFL BULB MAX 13-WATT OR LED MAX 9-WATT

THERE ARE 2 X 4W LED BULBS IN THE BOX.

Step 1

Step 2

       Step 3

Make sure all parts could be aligned before assemble 

Hang each Crystal Drop(E) onto the Body Frame(A).       Put the light on a level surface to check

Do not rotate lamp body too hard avoid base screw broken

Insert the bulb(D) into the socket.

       if everything is stable.

Insert the Tube (B) into the Base(C).

Insert the bottom nipple of the Body Frame (A) into the Tube(B).

Be careful not to twist the power cord and tighten securely

ENJOY YOUR LAMP

 1  

 2  

 3  

A

B

C

D

Отзывы: