PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware
contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 6 minutes.
PLEASUE USE TYPE"B" BULB MAX 40-WATT OR CFL BULB MAX 13-WATT OR LED MAX 9-WATT
THERE ARE 2 X 4W LED BULBS IN THE BOX.
Step 1
Step 2
Step 3
Make sure all parts could be aligned before assemble
Hang each Crystal Drop(E) onto the Body Frame(A). Put the light on a level surface to check
Do not rotate lamp body too hard avoid base screw broken
Insert the bulb(D) into the socket.
if everything is stable.
Insert the Tube (B) into the Base(C).
Insert the bottom nipple of the Body Frame (A) into the Tube(B).
Be careful not to twist the power cord and tighten securely
ENJOY YOUR LAMP
1
2
3
A
B
C
D