5
Original instructions
Original instructions
Disassembly
1. Remove the endcover and the gasket.
2. Pull out the impeller using two screw drivers or other suitable implements.
3. Remove the lip seal.
4. Remove the shaft with ball bearings by pressing on the shaft end from the
impeller side.
5. Remove the ball bearings. Do not press the ball bearings over the sealing
surface.
6. Remove the o-ring from the shaft.
Assembly
1. Mount the ball bearings on the shaft. Do not press the ball bearings over the
sealing surface.
2. Mount the o-ring on the shaft.
3. Press the shaft with ball bearings into the body.
4. Mount the lip seal (spring towards the impeller).
5. Lubricate the impeller with JP Impeller Lubricant and fit it with a rotating
movement in the intended direction of rotation.
6. Fit the gasket before mounting the endcover.
Waste handling material recycling
At the products end of life, please dispose of the product according to applicable
law. Where applicable, please disassemble the product and recycle the parts
material.
Pos
Nos
Description
Art.no
1
1
Body F6B-9 1/1-CAM
01-24713-1
2
1
Endcover F5B/F6B-9
01-45312-1
3
1
Impeller
08-812B-1
4
1
Gasket F5B/F6B-9
01-45315
5
1
Carrier complete
04-46408-01
5
1
Carrier complete
04-46408-02
6
1
Lip seal 16x28x7 DPSM
0.2233.001
7
2
Ball bearing 6203 2 RS1 ST
0.3431.742
8
1
O-ring 15.3x2.4
0.2173.402
9
4
Screw M5x8 DIN933 Slotted brass 0.0141.502
10
1
Washer F5B/F6B/F7B
01-45680
Содержание F6B-9
Страница 7: ......