No gas leakage?

5.

Detach the charge hose

6.

from the service port, open 2-way valve and 3-way. Turn

the valve rod anticlockwiseuntil hitting lightly.

In case of gas leakage, tighten parts of pipe connection. If

leakage stops, then proceed 6. steps

If it does not stop gas leakage, discharge whole refrigerants from the service

port. After

À

aring work again and vacuumize,

¿

ll up prescribed

refrigerant from the gas cylinder.

Anti countercurrent joint

Gaugemanifold(for R410A)

2-way valve Liquid Side

3-way valve Gas Side

Vacuum pump(for R410A)

Tube(for R410A)

Close

2-way valve

3-way valve

Open 90

O

2-way valve

3-way valve

2-way valve

3-way valve

Valve rod cap

Valve rod cap

Service port cap

   To prevent the gas leakage, turn the service port’s cap, the valve rod’s cap for 2-way

valve and 3-way’s a little more than the point where the torque increases suddenly.

After attaching the each caps, check the gas leakage around the caps.

7.

8.

Step 1.

Step 2.

Step 3.

Step 7.

Step 6.

Step 4.

The power source must be exclusively used for air

ƽ

conditioner. (Over I0A)

In the case of installing an air conditioner in a moist place,

ƽ

please install an ea-

For installation in other places, use a circuit breaker as far

ƽ

as possible.

Pipe cutting is carried out with  a  pipe cutter and burs must

ƽ

be removed.

After inserting the

À

are nut,

À

aring work is carried out.

ƽ

If the refrigerant  of  the air conditioner leaks, it is necessary to discharge all the

ƽ

refrigerant. Vacuumize

¿

rst, then

c

harge the liquid refrigerant into air conditio-

ner according to the amount marked on the name plate.

Please do not let other cooling medium, except speci

¿

ed one (R410A), or air

ƽ

enter into the cooling circulation system. Otherwise, there will be abnormal

high pressure in the system to make it crack and lead to personal injuries.

1

Power Source Installation

2

Cutting and Flaring Work of Piping

Flare tooling die

1.Cut pipe

2.Remove burs

3.Insert the

À

are nut

CAUTION

Flare tool for R410A

Conventional

À

are tool

Clutch-type

clutch-type(Rigid-type) Wing-nut type (Imperial-type)

A

0~0.5mm

1.0~1.5mm

1.5~2.0mm

rth leakage breaker.

4.Flare pipe

Lean

Damage of

À

are Crack

Partial

Too outside

Correct

Incorrect

3

On Drainage

It becomes

high midway.

The gap with the

ground is too smal

There is the bad
smell from a ditch

It waves.

The end is imm-
ersed in water.

Please install the drain hose so as to be downward slope without fail.
Please don’t do the drainage as shown below.

ƽ
ƽ

Please pour water in the drain pan  of  the indoor unit, and

ƽ

is carried out surely to outdoor.

In case that the attached drain hose is in a room, please

ƽ

apply heat insulation to

Less than

5cm

con

¿

rm that drainage

it without fail.

4

Check Items for Test Run

Put check mark

in boxes

Gas leak from pipe connecting?

Heat insulation of pipe connecting?

Are the connecting wirings of indoor and outdoor

¿

rmly

Is the connecting wiring of indoor and outdoor

¿

rmly

¿

xed?

Is drainage securely carried out?

Is the earth line securely connected?

Is the indoor unit securely

¿

xed?

Is power source voltage abided by the code?

Is there any noise?

Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?

Is the operation of room temperature regulator normal?

Please kindly explain to our customers how to operate
through the instruction manual.

Check for Installation and Test Run

Ƶ

inserted to the terminal block?

Ƶ

1

1+2=

kg

R410A

2

kg

2=

1=

B

C

D

F

E

kg

A

This product contains fluorinated greenhouse gases covered by 
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,

‡WKHIDFWRU\UHIULJHUDQWFKDUJHRIWKHSURGXFW
‡WKHDGGLWLRQDOUHIULJHUDQWDPRXQWFKDUJHGLQWKHILHOGDQG
‡WKHWRWDOUHIULJHUDQWFKDUJH

on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop value cover).
A  contains fluorinated greenhouse gases covered by the Kyoto 
Protocol
B  factory refrigerant charge of the product: see unit name plate
C   additional refrigerant amount charged in the field
D   total refrigerant charge
E   outdoor unit
F   refrigerant cylinder and manifold for charging 

Contains fluorinated greenhouse gases
covered by the Kyoto Protocol

Refrigerant charge label

Ƶ

2-way valve

3-way valve

Содержание York YH9FZH12-AFX

Страница 1: ...INSTALLATION MANUAL High Wall Fixed R 410A 60Hz YH9FZH12 18 24BAH AFX Read this manual before installation and operation Make sure that it is well kept for later reference ...

Страница 2: ......

Страница 3: ...n a wall place where the indoor unit can receive signals when the Àuorescent ƽ lamps in the room are lightened Outdoor Unit Place which is less affected by rain or direct sunlight and is suf ciently ventilated ƽ Place possible to bear the unit where vibration and noise are not increased ƽ Place where discharged wind and noise do not cause a nuisance to the neighbors ƽ Place where a distance marked...

Страница 4: ...f indoor unit and pull it out on the front side then connect them 3 Coat the aring seal face with refrigerant oil and connect pipes Cover the connection part with heat insulation materials closely and make sure xing with adhesive tape Fixing the indoor unit body Hang surely the unit body onto the upper notches of the mounting plate Move the body from side to side to verify its secure xing In order...

Страница 5: ... perform air purging from the refrigerant pipes and indoor unit using a vacuum pump then Spanner Forced fastening without careful centering may damage the threads and cause a leakage of gas Pipe Diameter Fastening torque Liquid side6 35mm 1 4 18N m Liquid Gas side9 52mm 3 8 42 N m Gas side 12 7mm 1 2 55N m Gas side 15 88mm 5 8 60 N m Max Elevation In case the elevation A is more than 5m oil trap s...

Страница 6: ...rth leakage breaker 4 Flare pipe Lean Damage of Àare Crack Partial Too outside Correct Incorrect 3 On Drainage It becomes high midway The gap with the ground is too smal There is the bad smell from a ditch It waves The end is imm ersed in water Please install the drain hose so as to be downward slope without fail Please don t do the drainage as shown below ƽ ƽ Please pour water in the drain pan of...

Страница 7: ......

Страница 8: ...2015 Johnson Controls Inc www johnsoncontrols com Doc No AH9FZHAH 151103 ...

Отзывы: