Pre-Installation Planning and Requirements
2–2
iSTAR Ultra Installation and Configuration Guide
Pre-Installation Planning and Requirements
Pre-installation involves the following:
1. Checking equipment (hardware, software, power supply, and wiring).
2. Checking power, wiring, equipment clearances, and code compliance at the site.
3. Ensuring the proper tools are available.
Equipment Check
Verify that the contents of the shipped boxes match the packing lists. Contact Software House
if any items are missing or damaged.
The iSTAR Ultra hardware does not include mounting hardware for an installation. Mounting
hardware depends upon the site and must be approved by a structural engineer or other
certified professional.
Software House recommends anchoring systems capable of sustaining a 75 lb. load (without
cables).
Types of Mounting
The iSTAR Ultra and its components can be installed in a wall mount enclosure or in a
separate rack mount enclosure.
Environmental Requirements
lists the iSTAR Ultra environmental requirements.
Site Requirements
Ensure that the site is ready:
The iSTAR Ultra installation must be performed by a certified installer.
The iSTAR Ultra must be installed and wired according to local and national regulations.
The iSTAR Ultra must be installed in a restricted access, protected area.
Non-limited power supply lines must maintain (1/2 inch (1.3 cm)) spacing from limited
power supply lines and other signaling lines. Secure lines must be installed in accordance
to local and national electric codes.
The site must be approved and all wiring must comply with UL requirements and other
codes, in accordance with the National Electric Code, ANSI/NFPA70-1993.
Table 2-1:
Environmental Requirements
Status
Range
Operation
32° F (0° C) to 122° F (50° C)
Storage
4° F (-20° C) to 158° F (70° C)
Содержание tyco iSTAR Ultra
Страница 8: ...Table of Contents viii iSTAR Ultra Installation and Configuration Guide...
Страница 66: ...Visual Indicators 4 10 iSTAR Ultra Installation and Configuration Guide...
Страница 98: ...Readers and Accessory Boards 5 32 iSTAR Ultra Installation and Configuration Guide...
Страница 101: ...Overview iSTAR Ultra Installation and Configuration Guide 6 3 Figure 6 1 IP ACM Ethernet Door Module v2...
Страница 102: ...Overview 6 4 iSTAR Ultra Installation and Configuration Guide...
Страница 110: ...Firmware Upgrades 7 8 iSTAR Ultra Installation and Configuration Guide...
Страница 118: ...GCM Battery Replacement 8 8 iSTAR Ultra Installation and Configuration Guide...