5750149-UIM-D-1219
30
Johnson Controls Ducted Systems
Specially Engineered Installations
The above requirements shall be permitted to be waived where special
engineering, approved by the authority having jurisdiction, provides an
adequate supply of air for combustion and ventilation.
VENT BLOWER ROTATION
For ease of venting, the vent blower may be rotated 90° in either direc-
tion. For upflow installations the vent may exit through the top or either
side of the cabinet. For downflow installations, the vent blower must be
rotated so that the vent exits through either side of the cabinet. See Fig-
ures 23-26 for illustrations of different inducer rotation positions.
SECTION VIII: START-UP AND
ADJUSTMENTS
The following start-up checks
MUST
be performed by the furnace
installer on every new furnace installation.
1.
Gas piping leak check.
2.
Furnace input rate check.
3.
Air temperature rise check.
Instructions on how to perform each of these required installation
checks are listed in the sections below.
When the gas supply is initially connected to the furnace, the gas piping
may be full of air. In order to purge this air, it is recommended that the
ground union be loosened until the odor of gas is detected. When gas is
detected, immediately retighten the union and check for leaks. Allow
five minutes for any gas to dissipate before continuing with the start-up
procedure. Be sure proper ventilation is available to dilute and carry
away any vented gas.
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon-
monxide poisoning or death.
The following steps shall be followed for each appliance connected to the venting system being placed into operation, while all other appliances
connected to the venting system are not in operation:
1. Inspect the venting system for proper size and horizontal pitch. Determine that there is no blockage, restriction, leakage, corrosion or other defi-
ciencies, which could cause an unsafe condition
2. Close all building doors and windows and all doors.
3. Turn on clothes dryers and TURN ON any exhaust fans, such as range hoods and bathroom exhausts, so they shall operate at maximum
speed. Open the fireplace dampers. Do not operate a summer exhaust fan.
4. Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so the appliance shall operate continu-
ously.
5. Test each appliance (such as a water heater) equipped with a draft hood for spillage (down-draft or no draft) at the draft hood relief opening
after 5 minutes of main burner operation. Appliances that do not have draft hoods need to be checked at the vent pipe as close to the appliance
as possible. Use a combustion analyzer to check the CO
2
and CO levels of each appliance. Use a draft gauge to check for a downdraft or inad-
equate draft condition.
6. After it has been determined that each appliance properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace
dampers and any other gas burning appliance to their normal condition.
7. If improper venting is observed during any of the above tests, a problem exists with either the venting system or the appliance does not have
enough combustion air (Supply Air from outside) to complete combustion. This condition must be corrected before the appliance can function
safely.
8. Any corrections to the venting system and / or to the supply (outside) air system must be in accordance with the National Fuel Gas Code
Z223.1 or CAN/CGA B149.1 Natural Gas and Propane Installation Code (latest editions). If the vent system must be resized, follow the appro-
priate tables in Appendix G of the above codes or for this appliance.
!
FIGURE 38:
Attic and Crawl Space Combustion Air Termination
WARNING
Be sure to instruct the owner not to block this intake pipe.
´0,1
´0,1,080
%(7:((1%27720
2)$,5,17$.($1'
$1<0$7(5,$/%(/2:
$
!
IMPORTANT:
All electrical connections made in the field and in the
factory should be checked for proper tightness.
Содержание TM9V C Series
Страница 18: ...5750149 UIM D 1219 18 Johnson Controls Ducted Systems FIGURE 23 Upflow Configuration A0945 001 ...
Страница 20: ...5750149 UIM D 1219 20 Johnson Controls Ducted Systems FIGURE 25 Horizontal Left Configuration A0946 001 ...
Страница 21: ...5750149 UIM D 1219 Johnson Controls Ducted Systems 21 FIGURE 26 Horizontal Right Configuration A0946 001 ...