background image

VEC100 Generic RTU Controller, Staged Heating

and Staged Cooling Quick Start Guide

About this guide

This quick start guide provides the basic information you

need to configure and install the Verasys

®

 Equipment

Controller (VEC), LC-VEC100-0, using the Verasys generic

rooftop unit (RTU) staged heating and staged cooling

controller application. The application controls a third-

party changeover bypass (COBP) system or a third-party

variable air volume (VAV) unit.
For further information, refer to the 

Verasys Equipment

Controller (VEC) Installation Guide (24-10143-1272)

 and the

VEC100 Generic RTU Controller, Staged Heating and Staged

Cooling Application Note (12013443)

.

Table 1: Application features

Options available Possible values

Number of Heating

Stages Installed

0 to 2

Number of Cooling

Stages Installed

0 to 4

Economizer

Installed

State 0: the economizer is not

available.

State 1: the economizer is available.

Air Proving Switch

Setup

State 0: fan status device

State 1: duct static pressure sensor

State 2: none

Rooftop Controller

Type

State 0: changeover bypass

State 1: VAV

Cancel ASCD Timers •

State 0: false

State 1: true

Demand Ventilation

Feature

State 0: demand ventilation is off.

State 1: demand ventilation is on.

Mounting the controller

To mount the controller, complete the following steps:

1. Mount a 20 cm (8 in.) section of 35 mm (1.3 in.) DIN

rail horizontally.

Note: 

Mount the controller in the horizontal

position.

2. On the back of the controller, extend the two

mounting clips.

Figure 1: Pull down lower mounting clips

3. Place the controller on the DIN rail.
4. Push the bottom mounting clips inward (up) to

secure the controller on the DIN rail.

Figure 2: Push up lower mounting clips

Wiring the controller

Zone bus terminal block

The zone bus terminal block is a grey, removable, 4-

terminal plug that fits into a board-mounted jack. Wire the

removable zone bus terminal block plugs on the controller

on the top row of the stacked connector, and other field

controllers in a daisy-chain configuration using 3-wire

twisted, shielded cable as shown in the following figure.

LIT-12013486   

2021-07-14

LC-VEC100-0

Содержание SMART EQUIPMENT VERASYS VEC100

Страница 1: ...tus device State 1 duct static pressure sensor State 2 none Rooftop Controller Type State 0 changeover bypass State 1 VAV Cancel ASCD Timers State 0 false State 1 true Demand Ventilation Feature State 0 demand ventilation is off State 1 demand ventilation is on Mounting the controller To mount the controller complete the following steps 1 Mount a 20 cm 8 in section of 35 mm 1 3 in DIN rail horizon...

Страница 2: ...ply power terminal block The 24 VAC supply power terminal block is a gray removable 3 terminal plug that fits into a board mounted jack on the top right of the controller Wire the 24 VAC supply power wires from the transformer to the HOT and COM terminals on the terminal plug as shown in the following figure The middle terminal on the supply power terminal block is not used Figure 5 24 VAC Supply ...

Страница 3: ... your credentials 2 Navigate to Product Information Support Device Updates 3 Download the package file for the application to the root folder of a USB 2 0 drive The package file name is the following VEC100 StgHTG StgCLG_xxxx pkg Note Ensure that the USB drive is formatted as FAT or FAT32 4 Insert the USB drive into the USB port on the VEC 5 If the download does not start immediately then in the c...

Страница 4: ...COBP wiring diagram Figure 6 Changeover bypass wiring diagram VEC100 VEC100 Generic RTU Controller Staged Heating and Staged Cooling Quick Start Guide 4 ...

Страница 5: ...ne humidity sensor monitor only optional ZN H Table 4 Changeover bypass wiring diagram Number Description Object name if given 17 Return air CO2 Range 0 ppm to 2 000 ppm 0 VDC to 10 VDC RA CO2 18 Return air temperature sensor RA T 19 Outside air temperature sensor Note This is a required sensor if the VEC100 controls the economizer Position the sensor in a shaded area on the north side of the buil...

Страница 6: ...VAV wiring diagram Figure 7 VAV wiring diagram VEC100 VEC100 Generic RTU Controller Staged Heating and Staged Cooling Quick Start Guide 6 ...

Страница 7: ...ir Proving Switch Setup Selects the type of setup for airflow proof Adjustable None 0 Fan Status Device 1 Duct Static Pressure Sensor 2 None Equalize Cooling Stages Runtime Enables the compressors to run in lead lag mode based on runtime Adjustable No 0 No 1 Yes OAT Cooling Lockout Temperature Sets the temperature at which outside cooling lockout occurs Adjustable 50 F 10 C 0 F to 100 F 18 C to 38...

Страница 8: ...I JIANGSU PROVINCE 214028 CHINA JOHNSON CONTROLS WESTENDHOF 3 45143 ESSEN GERMANY JOHNSON CONTROLS 507 E MICHIGAN ST MILWAUKEE WI 53202 USA Contact information Contact your local branch office www johnsoncontrols com locations Contact Johnson Controls www johnsoncontrols com contact us 2021 Johnson Controls All rights reserved All specifications and other information shown were current as of docum...

Отзывы: