background image

364861-UIM-G-1211

30

Johnson Controls Unitary Products

IGNITION SYSTEM SEQUENCE

1.

Turn the gas supply ON at external valve and main gas valve.

2.

Set the thermostat above room temperature to call for heat.

3.

System start-up will occur as follows:

a.

The induced draft blower motor will start and come up to
speed. Shortly after inducer start-up, the hot surface igniter
will glow for about 17 seconds.

b.

After this warm up, the ignition module will energize (open)
the main gas valve.

c.

After flame is established, the supply air blower will start in
about 30 seconds.

CALCULATING THE FURNACE INPUT (NAT. GAS)

Burner orifices are sized to provide proper input rate using natural gas

with a heating value of 1030 BTU/Ft

3

 (38.4 MJ/m

3

). If the heating value

of your gas is significantly different, it may be necessary to replace the
orifices.

Verify natural gas input rate by clocking meter.

1.

Turn off all other gas appliances and pilots.

2.

Run furnace for a minimum of 3 minutes in heating operation.

3.

Measure time (in sec) for gas meter to complete 1 revolution and
note reading. The 2 cubic feet dial provides a more accurate mea-
surement of gas flow.

4.

Refer to Table 14 for cubic feet of gas per hour.

5.

Multiply cubic feet per hour by heating valve (BTU/cu ft) to obtain
input.

If clocked rate does not match the input rate from the unit nameplate.
follow steps in next section to adjust the manifold pressure. Repeat
steps 2 - 5 until correct input is achieved.

HOT SURFACE IGNITION SYSTEM
Do not attempt to light this furnace by hand (with a match or any
other means). There may be a potential shock hazard from the
components of the hot surface ignition system. The furnace can
only be lit automatically by its hot surface ignition system.

DO NOT set manifold pressure less than 3.2” w.c. or more than 3.8”
w.c. for natural gas at sea level. If manifold pressure is outside this
range, change main burner orifices.

NOTICE

If orifice hole appears damaged or it is suspected to have been
redrilled, check orifice hole with a numbered drill bit of correct size.
Never redrill an orifice. A burr-free and squarely aligned orifice hole is
essential for proper flame characteristics.

DO NOT bottom out gas valve regulator adjusting screw. This can
result in unregulated manifold pressure and result in excess overfire
and heat exchanger failures.

Be sure to relight any gas appliances that were turned off at the start
of this input check.

NOTICE

Содержание GG9S*MP

Страница 1: ...Typical Combustion Pipe Drain Tee 17 Upflow Configuration 18 Downflow Configuration 19 Horizontal Left Configuration 20 Horizontal Right Configuration 21 Dimensions 23 Home Layout 24 Termination Confi...

Страница 2: ...een 55 F 13 C and 80 F 27 C The air filter must be replaced upon substantial completion of the construction process Clean furnace duct work and components upon substantial com pletion of the construct...

Страница 3: ...the following using the latest edition available STEP 1 Safety US National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and the Installation Standards Warm Air Heating and Air Conditioning Systems ANSI NFP...

Страница 4: ...on FOR FURNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in pa...

Страница 5: ...ccess cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order to use...

Страница 6: ...uld always be installed on the side desig nated as top side See Figures 4 5 FURNACE ASSEMBLY PC SERIES COILS These upflow coils are designed for installation on top of upflow fur naces only If the coi...

Страница 7: ...e seal to prevent air leakage through the unused bottom opening However if the furnace is to be installed on a surface that is uneven or if it is to be installed on blocks or otherwise raised off the...

Страница 8: ...ts at three locations to properly sup port the furnace Place one support at the supply end of the furnace one support located approximately in the center of the furnace near the blower shelf and the t...

Страница 9: ...binet and Duct Dimensions BTUH kW Input Nominal CFM m3 min Cabinet Size Cabinet Dimensions Inches Approximate Operating Weights A in A cm B in B cm C in C cm Lbs kg 40 11 7 800 22 7 A 14 1 2 36 8 13 3...

Страница 10: ...he instructions in this section specify the type of gas approved for this furnace only use those approved gases The instal lation of a drip leg and ground union is required Refer to Figure 16 FIGURE 1...

Страница 11: ...aced on the octagon hub located on the gas inlet side of the valve Placing a wrench to the body of the gas valve will damage the valve causing improper opera tion and or the valve to leak Table 5 Nomi...

Страница 12: ...e as shown in Figure 17 Electronic thermo stats may require the common wire to be connected Apply strain relief to thermostat wires passing through cabinet If air conditioning equip ment is installed...

Страница 13: ...ressor G Fan PP11C70224 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Clipping Jumper W914 for electric heat on thermostat is not necessary 24VAC Humidifier Optional C...

Страница 14: ...S HGD HP RHS O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot W1 66 out Heat Y Compressor DEMAND DEFROST CONTROL X L Malfunction Light W Auxiliary Heat SINGLE STAGE HEAT PUMP 1 1 Par...

Страница 15: ...n stream from the furnace that operates on W2 will be supplying cold air in the Heating mode to the occupied spaces unless W2 is energized GAS PIPING Furnace gas supplies must be provided as specified...

Страница 16: ...rom the TWIN terminal of Furnace 1 to the TWIN terminal of Furnace 2 3 Install a separate 24V relay as shown in the diagram below Use of this relay is required as it ensures that the transformers of t...

Страница 17: ...tch vacuum hose How ever ensure that all pressure switch hoses are routed such that they prevent any condensate from entering the pressure switch To Open Or Vented Drain Tee 5 Min Open Stand Pipe Anti...

Страница 18: ...will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose Move rain gutter hose to t...

Страница 19: ...tch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose to...

Страница 20: ...e switch hose to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this po...

Страница 21: ...the 90 fitting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to...

Страница 22: ...d to PVC pipe must be glued with cement that is approved for use with BOTH materials Metallic materials must not be used for venting or air intake 5 If a flexible connector is used in the vent system...

Страница 23: ...OMBUSTION AIR VENTING FIGURE 29 Dimensions TABLE 8 Elbow Dimensions Elbow A Dimension 2 Standard 2 5 16 3 Standard 3 1 16 2 Sweep 3 1 4 3 Sweep 4 1 16 TABLE 9 Equivalent Length of Fittings Fitting Equ...

Страница 24: ...quirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local i...

Страница 25: ...on on air source from inside the building The vent for a single pipe system must be installed as specified in the venting section of these instructions with the vent terminating as shown in Figure 31...

Страница 26: ...Air Supply for proper installa tion Refer to Figure 27 3 VENTILATED COMBUSTION AIR Combustion air is supplied through a PVC or ABS pipe that is connected to the PVC coupling attached to the burner bo...

Страница 27: ...e 4 A automatically operated damper or automatically adjustable lou vers shall be interlocked so that the main burner cannot operate unless either the damper or the louver is in the fully open positio...

Страница 28: ...d in the enclosure b Not less than the sum of all vent connectors in the confined space 3 The duct shall be least the same cross sectional area as the free area of the air supply inlet opening to whic...

Страница 29: ...are not in operation 1 Inspect the venting system for proper size and horizontal pitch Determine that there is no blockage restriction leakage corrosion or other deficiencies which could cause an uns...

Страница 30: ...ate mea surement of gas flow 4 Refer to Table 14 for cubic feet of gas per hour 5 Multiply cubic feet per hour by heating valve BTU cu ft to obtain input If clocked rate does not match the input rate...

Страница 31: ...300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232...

Страница 32: ...ies on and follow the operating instruc tions to place the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After th...

Страница 33: ...long enough to adequately cool the furnace but not so long that cold air is blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown i...

Страница 34: ...4 Medium Low 1232 1313 1291 1280 1250 1209 1207 1148 1055 937 Low 826 821 853 858 838 817 794 776 760 711 80 2200 C High 2529 2435 2338 2256 2162 2041 1920 1794 1654 1501 Medium High 2166 2111 2070 20...

Страница 35: ...1483 1353 1209 Medium High 1543 1543 1516 1504 1477 1446 1382 1309 1202 1099 Medium Low 1238 1241 1243 1241 1252 1242 1201 1140 1074 967 Low 906 902 903 910 888 866 859 829 795 743 80 2200 C High 258...

Страница 36: ...leted between terminals R and W of the thermostat When the proper amount of combustion air is being provided the pressure switch will close the ignition control pro vides a 17 second ignitor warm up p...

Страница 37: ...ed Flashes description below If the main limit switch opens five times within a single call for heat the control will also indicate 4 Red Flashes and will enter a one hour soft lockout 5 RED FLASHES T...

Страница 38: ...ash three green flashes when the memory has been cleared then will resume the normal slow green flash after a five second pause SECTION XII REPLACEMENT PARTS LIST DESCRIPTION MOTOR MOTOR DIRECT DRIVE...

Страница 39: ...r motor speed connections shown are typical but may vary by model and application LEGENDE DS Commutateur de porte MOT Moteur soufflerie TST Thermostat ROS Commutateur de roulement IDM D induct moteur...

Страница 40: ...ge without notice Published in U S A 364861 UIM G 1211 Copyright 2011 by Johnson Controls Inc All rights reserved Supersedes 364861 UIM f 0511 Johnson Controls Unitary Products 5005 York Drive Norman...

Отзывы: