Johnson Controls Unitary Products GG8S*MP series Скачать руководство пользователя страница 16

356485-UIM-E-0210

16

Johnson Controls Unitary Products

Single-Wire Twinning Operation

Heating - On a call for heat (W signal) from the wall thermostat, both
furnaces will start the ignition sequence and the burners on both fur-
naces will light. About thirty seconds after the burners light, the blowers
on both furnaces will come on in heating speed. When the thermostat is
satisfied, the burners will all shut off and, after the selected blower off
delay time, both blowers will shut off at the same time. The twinning
control ensures that both blowers come on and shut off at the same
time. 
Cooling - On a call for cooling (Y signal) from the wall thermostat, both
furnace blowers will come on at the same time in cooling speed. When
the thermostat is satisfied, both blowers will stay on for 60 seconds,
then will shut off at the same time. 
Continuous Fan - On a thermostat call for continuous fan (G signal),
both furnace blowers will come on at the same time in cooling speed
and will stay on until the G signal is removed.

STAGING

This control can also be used along with a two-stage wall thermostat to
stage two twinned furnaces, making them operate like a single two-
stage furnace. This allows only one furnace to supply heat during times
when the heat output from one furnace is sufficient to satisfy the
demand. When one duct system is used for two furnaces, it is neces-
sary that the two blowers operate in unison. The twinning function of
this board ensures that both blowers turn on and off simultaneously,
and operate on the same blower speed. Even when only one furnace is
supplying heat, both furnace blowers must run.

Single-Wire Staging

The single-wire twinning feature of this board can also be used for stag-
ing of two furnaces. With this feature, a single wire is connected
between the TWIN terminal on one furnace board to the TWIN terminal
on the second furnace board. The board then communicates the blower
status from one furnace to the other along this wire. This communica-
tion makes the second furnace blower come on at the same time, and
on the same speed, as the first furnace blower. To ensure stable com-
munication, the common terminal of each control must be connected.

Single-Wire Staging Instructions

Connect the control wiring as shown in Figure 22. 

1.

Connect the low voltage wiring from the wall thermostat to the ter-
minal strip on the control board of Furnace #1. For staging applica-
tions, the wire from thermostat W1 is connected to the W
connection on the board on Furnace #1. The wire from thermostat
W2 is connected to Furnace #2 through a separate relay, as
described below.

2.

Connect a wire from the TWIN terminal of Furnace #1 to the TWIN
terminal of Furnace #2.

3.

Install a separate 24V relay as shown in the diagram below. Use of
this relay is required, as it ensures that the transformers of the two
furnaces are isolated, thus preventing the possibility of any safety
devices being bypassed.

4.

Connect the common between furnace #1 and furnace #2.

Single-Wire Staging Operation

Heating - On a call for first-stage heat (W1 signal) from the wall thermo-
stat, Furnace #1 will start the ignition sequence and the burners will
light. About thirty seconds after the burners light, the blowers on both
furnaces will come on in heating speed. When the thermostat is satis-
fied, the burners will shut off and, after the selected blower off delay
time, both blowers will shut off at the same time. On a call for second
stage of heat, the burners of Furnace #2 will also light and both blowers
will run. The twinning control ensures that both blowers come on and
shut off at the same time. 

Cooling - On a call for cooling (Y signal) from the wall thermostat, both
furnace blowers will come on at the same time. When the thermostat is
satisfied, both blowers will stay on for 60 seconds, then will shut off at
the same time. 

Continuous Fan - On a thermostat call for continuous fan (G signal),
both furnace blowers will come on at the same time in cooling speed
and will stay on until the G signal is removed.

SECTION VII: VENT SYSTEM

VENT CONNECTIONS

All models are provided with a flue transition that is sized for 4” diame-
ter vent connections. If a larger size vent connector is required, that
connection must be installed external to the furnace. Figure 22 shows
the furnace as it is shipped from the factory. To convert to a horizontal
or downflow position, remove the four screws that secure the inducer
assembly and rotate 90° being careful not to damage the gasket. Rein-
stall screws. Remove cap from appropriate vent outlet location on the
cabinet, cut insulation in cabinet to same size as the hole provided and
reinstall cap in the hole in the top panel.

 FIGURE 20:  

Single Wire Twinning Wiring Diagram

W

G

C

R

Y

TWIN

TO A/C

WALL THERMOSTAT

W

G

R

Y

ISOLATION

RELAY

FURNACE 2

CONTROL BOARD

W

G

C

R

Y

TWIN

FURNACE 1

CONTROL BOARD

 FIGURE 21:  

Single Wire Staging Wiring Diagram

In downflow applications, do not block the combustion air inlet. The
furnace must be installed on a coil cabinet or subbase to allow com-
bustion air to enter the burner compartment.

 FIGURE 22:  

Combustion Air Inducer

W

G

C

R

Y

TWIN

TO A/C

WALL THERMOSTAT

W1 G

R

Y

ISOLATION

RELAY

FURNACE 2

CONTROL BOARD

W

G

C

R

Y

TWIN

FURNACE 1

CONTROL BOARD

W2

COMBUSTION AIR INDUCER

90°

90°

Mounting Screw
(Remove)

Flue Transition
(Do Not Remove)

Mounting Screw
(Remove)

Pressure
Switch

Pressure Switch
Tube Routing

Содержание GG8S*MP series

Страница 1: ...Pressure 22 Blower Performance CFM Any Position without filter Bottom Return 24 Blower Performance CFM Any Position without filter Left Side Return 25 These high efficiency compact units employ induced combustion reli able hot surface ignition and high heat transfer aluminized tubular heat exchangers The units are factory shipped for installation in upflow or horizontal applications and may be con...

Страница 2: ...abinet support the ends of the furnace rather than lifting by the cabinet flanges at the return air openings bottom or sides or supply air opening 13 When lifting the furnace it is acceptable to use the primary heat exchanger tubes as a lifting point provided that the tubes are lifted at the front of the heat exchangers where attached to the vestibule panel Do not use the top return bend of the he...

Страница 3: ... the National Fire Protection Association Inc Batterymarch Park Quincy MA 02269 or for only the NFGC contact the American Gas Association 400 N Capital N W Washington DC 20001 or www NFPA org CANADA NSCNGPIC For a copy contact Standard Sales CSA International 178 Rexdale Boulevard Etobicoke Toronto Ontario Canada M9W 1RS STEP 3 Combustion and Ventilation Air US Section 5 3 of the NFGC air for Comb...

Страница 4: ...monoxide detector with an alarm and battery back up is installed on the floor level where the gas equipment is to be installed In addition the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling building or structure served by the side wall horizontal vented gas fueled equip...

Страница 5: ...ccess cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order to use the flanges remove the screw holding an individual flange rotate the flange so it is in the upward position and reinstall the screw then repeat this for all 4 flanges If the flanges are not used they ...

Страница 6: ...ould always be installed on the side desig nated as top side See Figures 4 5 FURNACE ASSEMBLY PC SERIES COILS These upflow coils are designed for installation on top of upflow fur naces only If the coil is used with a furnace of a different size use a 45 transition to allow proper air distribution through the coil 1 Position the coil casing over the furnace opening as shown in Fig ure 6 2 Place th...

Страница 7: ...he unit BOTTOM RETURN AND ATTIC INSTALLATIONS Bottom return applications normally pull return air through a base plat form or return air plenum Be sure the return platform structure or return air plenum is suitable to support the weight of the furnace The internal bottom panel must be removed for this application Attic installations must meet all minimum clearances to combustibles and have floor s...

Страница 8: ...6 15 2 cm minimum clearance between the front of the furnace and the support rods or straps All six suspension points must be level to ensure proper and quiet fur nace operation When suspending the furnace use a secure platform constructed of plywood or other building materials secured to the floor or ceiling joists Refer to Figure 11 for details and additional information When moving or handling ...

Страница 9: ...FM m3 min Cabinet Size Cabinet Dimensions Inches Approximate Operating Weights A A cm B B cm C C cm Lbs 40 11 7 800 22 7 A 14 1 2 36 8 13 3 8 34 0 10 3 26 2 89 60 17 6 1000 28 3 A 14 1 2 36 8 13 3 8 34 0 10 3 26 2 91 60 17 6 1200 34 0 A 14 1 2 36 8 13 3 8 34 0 10 3 26 2 94 80 23 4 1200 34 0 B 17 1 2 44 4 16 3 8 41 6 11 8 29 9 103 80 23 4 1600 45 3 C 21 53 3 19 7 8 50 5 13 6 34 5 114 80 23 4 2200 6...

Страница 10: ...s in this section specify the type of gas approved for this furnace only use those approved gases The instal lation of a drip leg and ground union is required Refer to Figure 15 FIGURE 13 Side Return Cutout Markings Some accessories such as electronic air cleaners and pleated media may require a larger side opening Follow the instructions supplied with that accessory for side opening requirements ...

Страница 11: ...ropane LP gas must have the LoNOx screens removed prior to installation and operation See propane instructions Table 5 Nominal Manifold Pressure Manifold Pressures in wc Manifold Pressures kpa Altitude feet Altitude m 0 7999 8000 8999 9000 9999 0 2437 2438 2742 2743 3048 Gas Heating Value BTU cu ft 800 3 5 3 5 3 5 Gas Heating Value MJ cu m 29 8 0 87 0 87 0 87 850 3 5 3 5 3 5 31 7 0 87 0 87 0 87 90...

Страница 12: ...nnect the thermostat wiring from the wiring connections on the thermostat to the terminal board on the ignition module as shown in Figures 17 or 18 Electronic thermostats may require the common wire to be connected Apply strain relief to thermostat wires passing through cabinet If air condition ing equipment is installed use thermostat wiring to connect the Y and C terminals on the furnace control...

Страница 13: ...pressor G Fan PP11C70224 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Clipping Jumper W914 for electric heat on thermostat is not necessary 24VAC Humidifier Optional C 24 Volt Common Y Compressor SINGLE STAGE AIR CONDITIONER Y Compressor Contactor SINGLE STAGE AIR CONDITIONER SINGLE STAGE AIR CONDITIONER G8C L Y M 8S G 9F G 8 9 S ID MODELS G T GLS G T G 8 9 S LF8 ...

Страница 14: ...LS HGD HP RHS O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot W1 66 out Heat Y Compressor DEMAND DEFROST CONTROL X L Malfunction Light W Auxiliary Heat SINGLE STAGE HEAT PUMP 1 1 Part Number S1 2HU16700124 3 24VAC Humidifier Optional External Humidistat Optional Open on Humidity Rise 3 Y2 Second Stage Compressor Step 9 of Thermostat Installer Configuration Menu must be set to Pu...

Страница 15: ...the furnace that operates on W2 will be supplying cold air in the Heating mode to the occupied spaces unless W2 is energized GAS PIPING Furnace gas supplies must be provided as specified with these instruc tions Since the furnaces are side by side with no space between gas supplies must enter on the right and left respectively All gas piping must be in accordance with the national fuel gas code AN...

Страница 16: ...escribed below 2 Connect a wire from the TWIN terminal of Furnace 1 to the TWIN terminal of Furnace 2 3 Install a separate 24V relay as shown in the diagram below Use of this relay is required as it ensures that the transformers of the two furnaces are isolated thus preventing the possibility of any safety devices being bypassed 4 Connect the common between furnace 1 and furnace 2 Single Wire Stag...

Страница 17: ...mney must extend at least 5 ft 1 5 m above the highest equipment draft hood or flue collar FAN ASSISTED COMBUSTION SYSTEM This appliance is equipped with an integral mechanical means to either draw products of combustion through the heat exchanger Ambient Combustion Air Supply This type installation will draw the air required for combustion from within the space surrounding the appliance and from ...

Страница 18: ...s must be given consideration in calculating free area If the free area of a specific louver or grille is not known Refer to Table 7 to estimate free area Ventilated Combustion Air The ventilated attic space or a crawl space from which the combustion air is taken must comply with the requirements specified in AIR SOURCE FROM OUTDOORS in this instruction or in Section 5 3 Air for Combustion and Ven...

Страница 19: ... simply slide the NOx screens out of the heat exchanger tubes and discard the screens 8 Replace all components in reverse order Reconnect all wiring CARBON MONOXIDE POISONING HAZARD Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monxide poisoning or death The following steps shall be followed for each...

Страница 20: ...pilots 2 Run furnace for a minimum of 3 minutes in heating operation 3 Measure time in sec for gas meter to complete 1 revolution and note reading The 2 cubic feet dial provides a more accurate mea surement of gas flow 4 Refer to Table 10 for cubic feet of gas per hour 5 Multiply cubic feet per hour by heating valve BTU cu ft to obtain input If clocked rate does not match the input rate from the u...

Страница 21: ...0 22 164 327 818 64 56 112 281 23 157 313 783 66 54 109 273 24 150 300 750 68 53 106 265 25 144 288 720 70 51 103 257 26 138 277 692 72 50 100 250 27 133 267 667 74 48 97 243 28 129 257 643 76 47 95 237 29 124 248 621 78 46 92 231 30 120 240 600 80 45 90 225 31 116 232 581 82 44 88 220 32 113 225 563 84 43 86 214 33 109 218 545 86 42 84 209 34 106 212 529 88 41 82 205 35 103 206 514 90 40 80 200 3...

Страница 22: ...e by adjusting gas valve regulator screw for the appropriate gas per the following 4 After the manifold pressure has been adjusted re calculate the furnace input to make sure you have not exceeded the specified input on the rating plate Refer to CALCULATING THE FURNACE INPUT NATURAL GAS 5 Once the correct BTU kW input has been established turn the gas valve to OFF and turn the electrical supply sw...

Страница 23: ...s 4 settings 60 90 120 and 180 seconds The fan off delay is factory set to 120 sec onds The fan off setting must be long enough to adequately cool the furnace but not so long that cold air is blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown in Figure 27 The temperature rise or temperature difference between the return air and...

Страница 24: ...2638 2540 2448 2339 2224 2111 1974 1831 Medium High 2234 2233 2147 2092 2042 1974 1907 1820 1705 1575 Medium Low 1722 1716 1690 1681 1603 1553 1489 1426 1335 1241 Low 1396 1375 1348 1325 1263 1200 1150 1120 1052 965 100B12 High 1314 1318 1292 1265 1223 1177 1119 1051 971 890 Medium High 1010 1004 1003 995 992 956 914 857 798 721 Medium Low 812 805 796 786 777 754 727 685 626 560 Low 661 659 644 62...

Страница 25: ...Low 1126 1115 1095 1049 1027 996 957 929 840 742 080C22 High 2972 2863 2769 2671 2571 2465 2352 2227 2095 1950 Medium High 2173 2146 2103 2082 2036 1966 1904 1827 1738 1621 Medium Low 1670 1667 1647 1618 1585 1549 1492 1408 1350 1238 Low 1371 1339 1317 1284 1259 1199 1147 1085 1024 928 100B12 High 1258 1278 1283 1259 1240 1204 1149 1073 1015 897 Medium High 986 995 1011 1003 962 935 913 861 808 73...

Страница 26: ...e switch will close the ignition control pro vides a 17 second ignitor warm up period the gas valve then opens the gas starts to flow ignition occurs and the flame sensor begins its sensing function The blower motor will energize 30 seconds after the gas valve opens if a flame is detected Normal furnace operation will continue until the thermostat circuit between R and W is opened which causes the...

Страница 27: ...nace will lock out for one hour and then restart 8 RED FLASHES This fault is indicated if the flame is lost 5 times 4 recycles during the heating cycle This could be caused by low gas pressure dirty or faulty flame sensor or faulty gas valve The furnace will lock out for one hour and then restart 9 RED FLASHES Indicates reversed line voltage polarity or grounding problem Both heating and cooling o...

Страница 28: ... L Models Only MISCELLANEOUS ORIFICE BURNER Natural 45 SIGHT GLASS OVAL 2 Req d GASKET FOAM Door 1 5 ft req d GASKET INTAKE PAN PLUG VENT HOLE BRACKET DOOR WIRING HARNESS FERRULE 3 Req d GROMMET 3 Req d MOTOR MOUNT TUBING SILICON DIAGRAM WIRING KNOB QUARTER TURN 4 Req d DESCRIPTION Continued REPLACEMENT PART CONTACT INFORMATION This is a generic parts list To request a complete parts list refer to...

Страница 29: ...356485 UIM E 0210 Johnson Controls Unitary Products 29 SECTION XI WIRING DIAGRAM FIGURE 28 Wiring Diagram ...

Страница 30: ...change without notice Published in U S A 356485 UIM E 0210 Copyright 2010 by Johnson Controls Inc All rights reserved Supersedes 356485 UIM D 0708 Johnson Controls Unitary Products 5005 York Drive Norman OK 73069 ...

Отзывы: