Johnson & Starley HI-SPEC J40 Скачать руководство пользователя страница 11

11

LOW RATE

MEDIUM RATE

HIGH RATE

kW

MJ/h

Btu/h

kW

 MJ/h

Btu/h

kW

MJ/h

Btu/h

INPUT

11.75

42.35

40,100

13.5

48.58

46,050

15.18

54.65

51,800

OUTPUT

8.79

31.65

30,000

10.26

36.92

35,000

11.72

42.2

40,000

Gas rate cv

1.08m

3

/h (38.4ft

3

/h)

1.24m

3

/h (44.1ft

3

/h)

1.40m

3

/h (49.8ft

3

/h)

1037Btu/ft

3

Burner setting

9.2mbar (3.7 in wg)

12.2mbar (4.9 in wg)

16.0mbar (6.4 in wg)

pressure (hot)

Main Injector

BRAY CAT 23/1050

18

250

   300

     350

       400                 450 ft

3

/min

0.12

    0.14

      0.17

       0.19                0.21 m

3

/sec

                    AIR VOLUME

mbar in.wg.
0.625 0.25

0.50

0.20

0.375 0.15

0.25

0.10

0.125 0.05

RESIST

ANCE EXTERNAL

 T

O HEA

TER

170V

180V

190V

200V

210V

Table 4

Main Burner Pressure Settings

Table 5

Fan Performance Curve

7.

INSTRUCTIONS FOR USERS

7.1

If the building is unoccupied, ensure that the Instructions for User are left taped to the air heater for the User, and
Installation Instructions are left at or near the air heater for use on future service calls.

7.2

If the building is occupied, hand the User Instructions over and ensure the User understands:

7.2.1

How to ignite the pilot and burner.

7.2.2

How to operate the Thermista-stat/room thermostat, time and heater ON/OFF switch and summer air circulation
switch, and that the time control must be reset following a power failure.

7.2.3

How to extinguish the pilot and main burner at the Multifunctional control, and switch off the electrical supply to the
heater.

7.2.4

How to remove, clean and refit the air filter and at what intervals (i.e. fortnightly, or weekly for new houses).

7.2.5

How to control the heating system by opening and closing warm air outlets.

7.2.6

How to obtain summer air circulation.

7.2.7

That the air grilles on the heater or heater compartment; grilles and ventilators in the walls, windows or doors of the
building 

MUST NOT BE OBSTRUCTED

.

7.2.8

That the heater must be serviced at least once a year by a competent person to ensure efficient and safe operation.

DISCONNECT

TERMINALS ‘17’ &’18’

Y

N

REPLACE FAN DELAY

CONTROL/LIMIT

SWITCH

REPLACE

ELECTRONIC MOD-

ULE

FAN CONTINUES TO RUN, OR CYCLES AFTER HEATING IS TURNED OFF

DOES

FAN

RUN ?

MAIN BURNER NOT CYCLING

(

ROOM TEMPERATURE TOO HIGH)

REPLACE

MULTIFUNCTIONAL

CONTROL

N

Y

REPLACE

ELECTRONICS

MODULE

DISCONNECT

MULTIFUNCTIONAL

CONTROL AT

TERMINAL 15

N

DOES

BURNER

GO

OUT?

DISCONNECT

THERMISTA-STAT

REPLACE

THERMISTA-STAT

Y

DOES

BURNER

GO OUT?

Содержание HI-SPEC J40

Страница 1: ...ssisted downflow ducted warm air heater which may be supplied with SYSTEM E T or BASIC control An ELJAN 6 circulator is available as an option ASpillage Monitoring Device TTB is fitted which senses th...

Страница 2: ...lication 3 VENTILATIONAND COMBUSTIONAIR 3 1 The room or internal space in which the heater is installed requires a permanent air vent of minimum effective area 62cm2 9in2 The air vent should be either...

Страница 3: ...iser ducts should be fully insulated with 50mm 2in fibreglass or similar If short extended duct runs are taken below floor level these should be similarly insulated and in addition wrapped with a soun...

Страница 4: ...m equivalent vertical height is 1 metre The installer must make a judgement based on his knowledge and experience and the examination and testing described above as to whether an existing flue system...

Страница 5: ...ance Inlet Flue Outlet Resistance Ki Resistance Ko 100 mm dia spigot 2 5 100 mm flue 2 5 125 mm dia spigot 1 0 125 mm flue 1 0 150 mm dia spigot 0 48 150 mm flue 0 48 Table 3 Inlet and outlet resistan...

Страница 6: ...rminal is specifically recommended The latter should be positioned in a free air space where it is not shielded by any structure A minimum of 1m 3ft from any vertical or inclined roof structure must b...

Страница 7: ...at d BASIC MODELS A24V room thermostat not supplied that complies with BS 800 BS 3955 and BS4201 is essential to ensure close control of comfort conditions An anticipator is located within the thermos...

Страница 8: ...ATING CONTROL is fully reset Wait three minutes and repeat steps 6 3 4 and 6 3 5 holding the OPERATING CONTROL depressed for a longer period until the Pilot burner remains alight 6 3 6 With the Pilot...

Страница 9: ...and allow 15 minutes for stability before continuing 6 6 2 Check the temperature rise across heater is between 45o C 55o C setting the fan speed as follows i SYSTEM E T heaters System E T provides a...

Страница 10: ...t exchanger b Extinguish the Main and Pilot burners c Ensure that there is no spillage evident by visually observing the draught diverter location on the air heater d If spillage is evident further in...

Страница 11: ...ow to operate the Thermista stat room thermostat time and heater ON OFF switch and summer air circulation switch and that the time control must be reset following a power failure 7 2 3 How to extingui...

Страница 12: ...and with the main burner lit ensure that the operation of Air Circulation fan does not affect the main burner flame profile 8 2 BURNERAND CONTROLASSEMBLYREMOVAL 8 2 1 Ensure that the Gas and Electric...

Страница 13: ...minals 16 N and 15 L g Water heater from connection block terminals 10 L and 9 N h Water Pump from connection block terminals 12 L and 11 N i Cleanflow from connection block terminals 19 24V and 20 0V...

Страница 14: ...8 13 6 Refitting or replacement is in reverse order 8 14 SPILLAGE MONITORING DEVICE TTB REMOVAL 8 14 1 Ensure that the electrical supply is isolated 8 14 2 Remove the appliance louvre door release th...

Страница 15: ...8 13 6 Refitting or replacement is in reverse order 8 14 SPILLAGE MONITORING DEVICE TTB REMOVAL 8 14 1 Ensure that the electrical supply is isolated 8 14 2 Remove the appliance louvre door release th...

Страница 16: ...minals 16 N and 15 L g Water heater from connection block terminals 10 L and 9 N h Water Pump from connection block terminals 12 L and 11 N i Cleanflow from connection block terminals 19 24V and 20 0V...

Страница 17: ...and with the main burner lit ensure that the operation of Air Circulation fan does not affect the main burner flame profile 8 2 BURNERAND CONTROLASSEMBLYREMOVAL 8 2 1 Ensure that the Gas and Electric...

Страница 18: ...ow to operate the Thermista stat room thermostat time and heater ON OFF switch and summer air circulation switch and that the time control must be reset following a power failure 7 2 3 How to extingui...

Страница 19: ...t exchanger b Extinguish the Main and Pilot burners c Ensure that there is no spillage evident by visually observing the draught diverter location on the air heater d If spillage is evident further in...

Страница 20: ...and allow 15 minutes for stability before continuing 6 6 2 Check the temperature rise across heater is between 45o C 55o C setting the fan speed as follows i SYSTEM E T heaters System E T provides a...

Страница 21: ...ATING CONTROL is fully reset Wait three minutes and repeat steps 6 3 4 and 6 3 5 holding the OPERATING CONTROL depressed for a longer period until the Pilot burner remains alight 6 3 6 With the Pilot...

Страница 22: ...at d BASIC MODELS A24V room thermostat not supplied that complies with BS 800 BS 3955 and BS4201 is essential to ensure close control of comfort conditions An anticipator is located within the thermos...

Страница 23: ...rminal is specifically recommended The latter should be positioned in a free air space where it is not shielded by any structure A minimum of 1m 3ft from any vertical or inclined roof structure must b...

Страница 24: ...ance Inlet Flue Outlet Resistance Ki Resistance Ko 100 mm dia spigot 2 5 100 mm flue 2 5 125 mm dia spigot 1 0 125 mm flue 1 0 150 mm dia spigot 0 48 150 mm flue 0 48 Table 3 Inlet and outlet resistan...

Страница 25: ...m equivalent vertical height is 1 metre The installer must make a judgement based on his knowledge and experience and the examination and testing described above as to whether an existing flue system...

Страница 26: ...iser ducts should be fully insulated with 50mm 2in fibreglass or similar If short extended duct runs are taken below floor level these should be similarly insulated and in addition wrapped with a soun...

Страница 27: ...lication 3 VENTILATIONAND COMBUSTIONAIR 3 1 The room or internal space in which the heater is installed requires a permanent air vent of minimum effective area 62cm2 9in2 The air vent should be either...

Страница 28: ...ssisted downflow ducted warm air heater which may be supplied with SYSTEM E T or BASIC control An ELJAN 6 circulator is available as an option ASpillage Monitoring Device TTB is fitted which senses th...