background image

 

Copyright © 2022 

Johnny’s Selected Seeds. All rights reserved. 

SEED BREEDERS, GROWERS, AND MERCHANTS SINCE 1973 

 

2.10  Locate the corner on the shutter where the outer flange 

meets the vertical tie bar. Measure ½" to the left of this 
corner and ¼" up from the bottom of the upper shutter 
flange and make a mark with a pencil. Drill a hole 

through the shutter flange in this location using a 

1

/

8

"  

drill bit (see figure 5). 

 
2.11  Hook one end of the return spring into the hole you just 

drilled and hook the other end around the hole located 
by the second louvre from the top (see figure 6). 

 
2.12  Insert an S-hook into the first available hole below the 

return spring on the tie bar (see figure 6), and attach 
another S-hook to the motor arm (see figure 7). Trim the 
excess chain. 

Note: Connect the chain between these two S-hooks  
so that there is just a slight amount of slack.  

 
2.13  Plug the power cord into the grounded outlet on the 

thermostat cord. 

 
 
STEP 3: INSTALLING THE THERMOSTAT 

 

3.1  Mount the thermostat onto your tunnel wall using  

#14 X 1" Tek screws or #12 X 1½" Woodmate screws. 

Note:

 

The thermostat should be placed at a convenient 

height for operation.

  

 
3.2  Plug the power cord into the grounded outlet that meets 

national, regional, and local codes. 

Note: Be sure to create a drip loop with the electrical 
cord, to prevent water from entering the thermostat 
housing. 

 
 
 

02.04.2022  |  KH, JG, ms 

Figure 5: Hole drilled for attaching the return spring.

 

Figure 6: Return spring, S-hook, and chain placement.

 

Figure 7: Attaching the S-hook and chain to the 
mounting arm.

 

Shutter 
tie bar 

Hole 

½" 

¼" 

Return

spring 

S-hook 

and chain 

Отзывы: